質問 41
In the product Cost by Order component, what does the system calculate depending on the order status? 1 answer
- A. WIP at actual costs or variances
- B. WIP at target costs or variances
- C. WIP at planned costs or variances
- D. Both WIP and variances or only variances
正解: A
質問 42
What are some of the unique attributes of an assessment cycle in Controlling? 2answers
- A. They use the original cost element during transfer
- B. They transfer only primary costs
- C. They transfer primary and secondary costs
- D. They use a secondary cost element during transfer
正解: C,D
質問 43
Which objects are predifined characteristics in SAP S/4HANA? 3 Answers
- A. Company Code
- B. Plant
- C. Region
- D. Product Category
- E. Controlling Area
正解: A,B,E
質問 44
You enter the actual activity quality for work and vacation in the cross-application time sheet. Which options can you choose in the master data of the activity type to ensure the quantities and values are posted in Management Accounting? There are TWO correct answers for this question
- A. Manual entry, indirect allocation
- B. Manual entry, no allocation
- C. Manual entry, manual allocation
- D. Indirect determination, indirect allocation
正解: A,B
質問 45
Which are mandatory attributes, when you create an operating concern with costing-based and account-based CO-PA? There are TWO correct answers for this question
- A. Company code currency in costing-based CO-PA
- B. Fiscal year variant
- C. Second period type
- D. Operating Concern Currency
正解: B,D
質問 46
What are some of the characteristics of SAP Core Data Services (CDS) views? Note: There are 3 correct answers to this question.
- A. CDS views duplicate data for reporting efficiencies.
- B. CDS views are considered system modifications.
- C. CDS views have ready-to-use content.
- D. CDS views have no latency.
- E. CDS views support authorization.
正解: C,D,E
質問 47
Your customer defined one distribution cycle in SAP S/4HANA.
You need to define a new distribution cycle. How can you ensure the new cycle is executed only after the existing one is completed?
- A. Select iteration in the cycle header of the new cycle
- B. Assign both cycles to the same cycle run group
- C. Select iteration in the cycle header of both cycles
- D. Assign each cycle to a different cycle run group
正解: B
質問 48
On which organizational level do you maintain profit center accounting in SAP S/4HANA?
- A. Controlling area
- B. Operating concern
- C. Company code
- D. Financial statement version
正解: A
質問 49
What can you analyze in detail when you transfer the cost component split from product cost planning to costing-based CO-PA?
- A. Sales revenues
- B. Cost of goods sold
- C. Variance categories
- D. Cost of goods manufactured
正解: B
質問 50
Which setting in the cost center master data do you use to assign the same attributes to similar cost center?
- A. Cost center type
- B. Object class
- C. Standard hierarchy node
- D. Cost center category
正解: D
質問 51
You want to prevent periodic cost fluctuations. Which activity should you choose to distribute irregular expenses to the relevant periods?
- A. Accrual calculation
- B. Periodic reposting
- C. Variance calculation
- D. Cost splitting
正解: A
質問 52
Which customizing activity do you perform in overhead cost controlling?
- A. Maintain costing variant parameters
- B. Define cost center categories
- C. Create value fields
- D. Define cost centers categories
正解: B
質問 53
To which objects do you assign the elements of the cost component split to ensure the transfer of costing to costing-based CO-PA?
- A. Segments
- B. G/L accounts
- C. Controling Area
- D. Value fields
正解: D
質問 54
Which objects do you use when you assign costs and revenue to the value fields in costingbased CO- PA?
- A. Allocation structure
- B. Overhead group
- C. Allocation template
- D. Transfer structure
正解: A
質問 55
Which customizing do you use for calculating work in progress (WIP)? There are THREE correct answers for this question
- A. Posting rule table
- B. Allocation structure table
- C. Assignment table
- D. Update table
- E. Settlement profile table
正解: A,C,D
質問 56
How can you define the overhead rate in a costing sheet? 2 answers
- A. As lot-based surcharge
- B. As equivalence number
- C. As percentage rate
- D. As quantity-based surcharge
正解: B,C
質問 57
You post a billing document in Sales and Distribution (SD). What data flows to profit center accounting?
3 answers
- A. Accruals
- B. Order quantity
- C. Revenues
- D. Payment discount
- E. Sales deductions
正解: A,D,E
質問 58
Which tasks can you perform on a production order in a make-to-order scenario with valuated stock?
There are TWO correct answers for this question
- A. Settle the variances to CO-PA
- B. Transfer reserves for realized costs
- C. Perform results analysis
- D. Calculate production variances
正解: A,C
質問 59
What are some of the objectives of Profitability Analysis? Note: There are 2 correct answers to this question.
- A. Provide the company with a detailed view of its financial statements by areas of responsibilities.
- B. Provide the company with information on the performance of its market segments.
- C. Allow the company to determine if the sales force achieved their contribution margin goals.
- D. Allow the company to determine standard costs and revenues according to the period accounting method.
正解: B,C
質問 60
You would like to allocate primary and secondary costs from a cost center to another cost center. Which allocation method will you use ?
- A. Periodic reposting
- B. Indirect activity allocation
- C. Distribution
- D. Assessment
正解: D
質問 61
You want to determine which operations of the routing should be considered in a product cost calculation. How do you do this? Note: There are 2 correct answers to this question.
- A. By marking the cost indicator in the control key assigned to the operation
- B. By defining a usage key in the header of the routing.
- C. By marking the Relevance to Costing indicator in the operation
- D. By assigning a cost center to the work center in the operation
正解: A,C
質問 62
You are executing an indirect activity allocation. What do you post to the sender and receiver?
- A. You post cost only to both the sender and receiver
- B. You post both quantity and cost to the receiver, and cost only to the sender
- C. You post both quantoty and cost to the sender, and cost only to receiver.
- D. You post quantity and cost to both the sender and receiver
正解: A
質問 63
......
SAP C_TS4CO_2020 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
| トピック 5 |
|