質問 # 50
MagicCube-Machine migration X86 migration field fear includes small machine migration to
- A. False
- B. True
正解:B
質問 # 51
The L1 integration project of the teaching center is: the guilt that the R feedback should contain is (multiple choice)
- A. client's capital budget and time requirements ()
- B. current project operation phase ()
- C. main competition opponents dynamic
- D. Day of the customer show, the situation of the S, the progress of the channel platform
正解:A、B、C
質問 # 52
Co-Care Gold Maintenance Service _ The main responsibility for the delivery of some of the work items is the channel partner (> (multiple choice)
- A. S-way support
- B. hardware support < 7-24*4H )
- C. field hardware replacement ()
- D. Set up 1 Kang check ()
- E. Service support plan and report|)
- F. on-site problem handling ()
正解:C、D、E、F
質問 # 53
For the customer, the total integrated -type mine only manages one integrator, and the management difficulty and specificity requirements are reduced.
- A. True (correct consultation
- B. a*
正解:A
質問 # 54
IP network evaluation and optimization service SI to sell in the presence of the company
- A. False
- B. True (positive B6 case)
正解:B
質問 # 55
Cloud-based 5HI architecture solution: What is the guilt of the implementation of the scheme?
- A. Proofclothes
- B. consulting plan
- C. implementation and joint iB service
- D. let the release
正解:B
質問 # 56
Huawei ICT people are based on the concept of _ 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54
54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 To ensure the customer's strategic needs.
- A. True (Positive case>
- B. wrong
正解:A
質問 # 57
Which of the following sub-cloud computing let 0 ? (multiple choices)
- A. desktop service M-solution: program implementation (correct
- B. Zeng 4> 2 cut you v Ji Ml volume service ( > 6
- C. cloud meter integration service-solution: implementation of the program <correct general case
- D. desktop cloud integration 5 _ solution: program implementation {positive level file)
正解:A、B、C、D
質問 # 58
Huawei's enterprise product training is based on the service life cycle. In the three stages of planning, design, implementation, and operation, there are corresponding courses to meet the requirements of the staff.
- A. s^-
- B. True <positive Sufferingcase>
正解:B
質問 # 59
Huawei customer support service capabilities include the following types of O (multiple choices)
- A. on-site support US, )
- B. a piece of support ability "Positive case>
- C. Active Support Ability Correction Case>
- D. software security ability (foot) file
- E. S program supports the correct file >
- F. special support ability ()
正解:A、B、C、D、E
質問 # 60
When using the UniSTAR SCT KS device to report the service fee, if the "committed" device quotation is found to be unable to use the "generate service quotation" function, what problems can the company have?
(multiple choices)
- A. BOQ is read-only _ (for example | correct file
- B. Dividing the quotation of the goods ()
- C. BQd: ^ is a service BOQ {>
- D. BOQ is the service quotation after the split ()
- E. The country where BOQ is located is not the current country {)
- F. SCT imported quotation quotation> (correct case)
正解:A、B、C、D、E、F
質問 # 61
The virtual machine class S that supports the Financing/Rejuvenation function in the Fusion Sphere includes:
- A. Lianlian clone virtual machine
- B. ordinary virtual M machine
- C. board by machine
正解:B
質問 # 62
L1 layer of the teaching center to deepen the design goal O (multiple choice)
- A. rovides technical support for the installation of $ bit (subcontracting construction unit), equipment supplier g project acceptance; ( > P
- B. On the 54 of the design bidding plan), further clarify the main request, refine the design plan and BOQ, and the design depth meets the construction drawing standard;
- C. The actual situation of the end of the platform, the Huawei (including the third party outside and choose
, the sub-contractor customer's job responsibility interface to go ^ clear the project's SOW (work and sleep) and support to determine RM2 <i |Ren matrix). - D. daphne interface, to ensure that the design and construction of the various subsystems of the project, K, structure, water, electricity, HVAC, decoration and other special design to maintain a high degree of consistency and coordination; | correct bitter case
正解:A、B、C、D
質問 # 63
What type of disaster relief plan type does not contain? (>
- A. Double-activity program
- B. disk K column synchronous recovery scheme
- C. deposit virtualized image scheme ()
- D. tomb in the Column $ column layer local high availability program
正解:C
質問 # 64
The recommended migration methods for DCRAinBow tool Linux system migration include:
- A. block migration
- B. system level migration
- C. day file level migration
正解:C
質問 # 65
Which of the following is not worthy of disaster recovery?
- A. disaster relief training
- B. disaster relief implementation
- C. Disaster relief planning and design service
- D. disaster recovery S training ()
正解:D
質問 # 66
Huawei Co-Care service is provided by Huawei Service capabilities, the ability of joint partners, and the stable operation of the customer network
- A. Huawei: technical support, spare parts service and on-site service, Taiwan partner: none
- B. Huawei: Technical support and spare parts service, partner: On-site service "Correct
- C. Huawei: technical support and on-site service, partner: spare parts service
- D. Huawei: spare parts service and on-site service, partner: technical support
正解:B
質問 # 67
The common parameter for the total energy efficiency indicator of the price is ().
- A. TQO
- B. COP
- C. EER
- D. . PUE
正解:D
質問 # 68
Where is the Fusionsphere snapshot file stored?
- A. USB Disk
- B. snapshot LUN
- C. Data storage
- D. CNA local disk
正解:C
質問 # 69
What is the difference between the WLAN after-sales network rules and the WLAN pre-sale network rules?
(multiple choice)
- A. Details of the B site ()
- B. Cover design
- C. oil design
- D. Planning in C AP number
正解:A、B、C
質問 # 70
What is the tool for the SmartNOS service?
- A. Packet tracer
- B. Ensp
- C. Service-turbo
- D. Smartkit
正解:C
質問 # 71
Project tendering is an open economic activity. Therefore, it is necessary to publish information in an open manner.
- A. False
- B. True (correct advisory F
正解:B
質問 # 72
IP network project service expansion when to introduce service sales is most appropriate
- A. customer after bidding
- B. After the client has established the project
- C. customer's pre-project M {IM file)
- D. customer is in the middle
正解:C
質問 # 73
According to the national standard GB 50174-2008 Electronic Information System Room Design Specification" requirements for the structure, Class machine room anti-mite defense should not be lower than net class
- A. False
- B. True
正解:A
質問 # 74
Not worthy of the teaching center L1 total integration, the development of the brand, the operation of the three axes is
- A. 1st floor visit
- B. Into Huawei eC^*
- C. sample point inspection
- D. Taiwanese inquiry Vr (Positive hardship)
正解:D
質問 # 75
......
Huawei H19-322(HCSA-Presales-Enterprise Services V1.0)試験は、エンタープライズサービスの分野における個人のスキルと知識をテストするために焦点を当てた認定試験です。この試験は、Huawei Certified Pre-sales Associates in Enterprise Servicesになりたいと願う個人を対象として設計されています。この認定は、候補者がエンタープライズサービスの分野でプリセールスサポートを提供するために必要なスキルと知識を持っていることを証明します。
検証済み材料を使うならまずH19-322テストエンジンを試そう:https://www.goshiken.com/Huawei/H19-322-mondaishu.html
合格するに必要な問題集はH19-322試験:https://drive.google.com/open?id=1_qM7uZP0OL4Lpj-xAtcTs6Ifhc19uqGq