質問 # 20
Where would you go to delete Actuals, Billing, and EVAs app logs?
- A. Foundations Set Up > Scheduled Jobs > Agp_ Log Cleanup Job
- B. PSA Administration page > PSA Batch Processes > App Loq Cleanup Job
- C. Set Up > Scheduled Jobs > Agg Log Cleanup Job
正解:B
質問 # 21
Your organization has decided to change the default scheduling strategy to be used as a starting point when creating an Assignment on the Project.
Which of the following tasks do you need to perform to accommodate this requirement?
- A. Remove scheduling strategy options that will not be used by adjusting the Assignment custom setting.
- B. Adjust the Configuration Value record for Scheduling
- C. Delete the Configuration Value record for Scheduling
正解:B
質問 # 22
You are notified that some approved Miscellaneous Adjustments records are not getting picked up in the Billing Event Generation process during month end billing.
Which two of the following system settings do you need to have in place for Miscellaneous Adjustments to get picked up in the billing run? (Choose two.)
- A. The Transaction Category value on the Miscellaneous Adjustments record exists in the Configuration option: BillingCategories.
- B. The person running the Billing Event Generation process does not have Billing Miscellaneous Adjustments permission control for the Region. Account, or Project selected on the Billing Generation process.
- C. The Effective Date value on the Miscellaneous Adjustments records is within the Date range of the Time period used on the Billing Generation process.
正解:A、C
質問 # 23
Users are complaining to you that the Milestones related list is not showing the most useful fields on the Project page. Which sequence of steps would you take to update the fields?
- A. Go to the Milestone object > Milestone Page Layout > Project Related List > Update fields
- B. Go to the Milestone object > Fields Sets > Project Field Set > Update fields
- C. Go to the Project object > Project Page Layout > Milestones Related List > Update fields
正解:C
質問 # 24
On the Resource Request Lightning page, your team is requesting changes to the Filter panel on the right side of the page, and would like to know what configurations are possible.
Which two of the following configurations are available for the Filter panel? (Choose two.)
- A. Add or Remove the Start and End Date fields
- B. Add or Remove the Skills filters
- C. Add or Remove Region. Practice, and Group filters
正解:A、C
質問 # 25
A manager was looking at utilization for a resource for the last two months. The resource was identified as 80% utilized for each month, but the subtotal section showed 160% for the user for that same two month period.
How can the report be fixed to show 80% instead of 160%?
- A. Adjust the Resource's work calendar to 40 hours and refresh the report
- B. Create a Summary Level formula so the subtotal is calculated and not summed
- C. Set the "Utilization" setting for Target Utilization Approach to "Weighted"
正解:C
質問 # 26
Your company has both full time and part time resources. From a Human Resources perspective, part time resources can work any number of hours per week. From a Resource Planning perspective, management has agreed that part time workers can be estimated at 20 hours per week.
Based on this information, how many work calendars should be created?
- A. One full time work calendar, one part time work calendar, and one generic flexible work calendar
- B. One full time work calendar, and one part time work calendar
- C. One full time work calendar, and one work calendar for each unique part time contract
正解:A
質問 # 27
When setting up a Utilization calculation, what does the "Is Report Master" field mean?
- A. Calculated utilization value from this job gets surfaced on the Contact record
- B. In a Utilization calculation hierarchy based on Region hierarchy, this is the primary/highest job
- C. Calculated utilization value from this job gets surfaced in the Resource Planner "Availability column"
正解:A
質問 # 28
As a system administrator, what are the recommended steps you should take to keep informed about new PSA features, components and tools?
- A. Join FinancialForce PSA Community, attend FinancialForceX Summit events, attend FinancialForce release previews/webinars, access PSA documentation
- B. Join FinancialForce PSA Community, review the newTrailhead modules, attend FinancialForce release previews/webinars, access PSA documentation
- C. Join FinancialForce PSA User Group, attend FinancialForce release previews/webinars, access PSA documentation, join the official SF user group
正解:A
質問 # 29
Managers want to be able to edit expenses once they are marked as approved, "Include in Financials" is selected, but before the Billing Events are created. Which of the following options do you choose under the Permission Control record?
- A. Expense Ops Edit
- B. Expense Entry
- C. Expense Edit
正解:C
質問 # 30
Which of the following is NOT true regarding version upgrades?
- A. All features are enabled by default
- B. Some enhancements and fixes are enabled automatically
- C. Any features that might have a significant impact on your data are disabled by default
正解:A
質問 # 31
A Services manager has asked you to set up a unique "FF Navigation" lightning component on the "Services Delivery Workspace" that will provide separate options to users based on which team (business unit) they belong to.
Which two of the following actions would successfully accomplish the required setup? (Choose two.)
- A. The system admin can enable the "Hide Navigation Sections" setting within the "FF Navigation" lightning component to support different teams
- B. The system admin can clone the page and create two unique pages that have the "FF Navigation" lightning component configured for their respective team
- C. The system admin can add the "FF Navigation" component to the page twice and setup component visibility rules to ensure the right team sees their navigation
正解:B、C
質問 # 32
Which of the following custom settings can be specific to a User?
- A. Timecard Entry Ul Personal
- B. Search Resources Global
- C. Assignment Settings
正解:A
質問 # 33
You are in the process of setting up your organization's Resources and learn that Resources in France will be working a 35-hour work week.
What will you need to do to set them up with the proper work calendar?
- A. Create a separate 35-hour work calendar and associate it to the French Resources, including any specific French Holidays.
- B. As the Work Calendar mostly impacts Utilization, set them up with a 40-work calendar, and then include the 35-hour hour work week in your utilization calculations.
- C. As PSA only allows one work calendar, it is best to implement a 40-hour work calendar and then create a validation rule to only allow 35 hours a week.
正解:A
質問 # 34
One of the Project Managers in your company has reached out to you to resolve an issue. Many of the Timecards that were approved in the last week against projects are not reflecting back on the Project Actuals.
You check that the Actuals Configuration Group > Calculation Mode option is set to "Scheduled".
What is the next step you should take?
- A. Navigate to "App Logs", and check the details of the error in the "Message" field for each agg log record
- B. Navigate to "Logs", and check the details of the error in the "Message" field.for each log record
- C. Navigate to "Error Logs", and check the details of the error in the "Message" field for each error log record
正解:A
質問 # 35
In your Company, a Resource Manager wants to provide the option for Resources to nominate themselves for upcoming work they are interested in. How can you set this up?
- A. Enable "Self-Nominate for Resource Request" custom setting > add the "PSA Resource Self-Nomination" Lightning component to the Resource Request Detail Page
- B. Enable "Self-Nominate for Work" custom setting > add the "PSA Self-Nomination" Lightning component to the Project Detail Page
- C. Enable "Candidates Can Self-Nominate for Work" custom setting > add the "PSA Resource Self-Nomination" Lightning component to the Lightning Home page
正解:A
質問 # 36
Your company wants to be able to automatically notify Resources by email about their missing timecards, when they have not entered the full amount of contracted hours for the previous week.
What is the best method to use within PSA to enable this?
- A. Use the Time Variance Scheduled Job and Email Alert
- B. Use a Salesforce Report based on Monthly Estimate vs Actuals Records and subscribe the Resource to receive the report by email
- C. Use the Missing Timecards Scheduled Job and Email Alert
正解:A
質問 # 37
You are in the process of migrating historical Skills and Certification information from your company's legacy system into FinancialForce PSA. Since the historical data volume is relatively low, you have decided to migrate the data manually and not use the Data Loader tool.
Using the Manager Skills and Certification lightning component, you first select the internal resource's name for whom you want to capture the "Skills and Certification" ratings. However, you notice you do not have the option to "Add" new skills and Certification for that resource on the screen. You are one of the Salesforce/PSA System Administrators for your company and have the System Administrator profile.
Of the following, which one could explain why you are unable to migrate skills data for that resource?
- A. You do not have the "Allow Skills and Certification Entry" set to TRUE in the Custom Settings > Permission Control Settings
- B. You do not have the required Skills and Certification Entry Permission Set assigned to the resource
- C. You do not have the "Skills and Certification Entry" Permission Control set to TRUE
正解:A
質問 # 38
A Resource Record is required to perform which two of the following actions? (Choose two.)
- A. Being assigned to a project
- B. Entering a timecard and expense report
- C. Creating a milestone
正解:A、B
質問 # 39
In your company, you have 2 types of users:
Type 1: Employees that need to enter Timecards, Expenses, and need access to the Resource Planner Type 2: Project Managers that need to enter Timecards, Expenses, and need access to the Resource Planner and the Project Planner All employees are tied to the basic "Standard PSA User" profile that gives them access only to the "Accounts" and "Contacts" objects.
Kevin is a Type 1 employee. However, when he logs into his Salesforce org, he can see the tab for the Project Planner, along with Resource Planner, Timecards, and Expenses.
Which of the following troubleshooting steps would you take to stop the Project Planner tab from appearing in Kevin's App Menu?
- A. Ensure Kevin does not have a Permission Control record for the "Project Planner View" permission
- B. Ensure Kevin is not assigned to the Project Manager Permission Set
- C. Ensure that the Project Planner is not Visible on Kevin's user profile
正解:A
質問 # 40
The consultants in your organization will be entering time against the project task and everyone else will enter time against the project/milestone.
Which of the following correctly identifies the steps you will need to complete?
- A. Navigate to Time Card Entry Ul Personal custom setting, click "New" and create a setting for your Consultant profile and then change the 'Task Time Entry Mode" to "Calculated"
- B. Navigate to Time Card Entry Ul Global custom setting, click "New" and create a setting for your Consultant profile and then change the 'Task Time Entry Mode" to "Calculated"
- C. Navigate to Time Card Entry Ul Switch custom setting, click "New" and create a setting for your Consultant profile and then change the 'Task Time Entry Mode" to "Calculated"
正解:C
質問 # 41
A user is having an issue where the Utilization report has inflated hours. The billable hours, calendar hours, and credited hours are double their actual values.
Which of the following is a possible cause of this issue?
- A. The report filter for "End Date" needs to be edited to a different date range
- B. The report needs to be filtered by Time Period Type
- C. The report needs to be grouped by Resource
正解:B
質問 # 42
When a Timecard is entered into the system, a record is generated that can be used in calculating Actuals.
What is that record called?
- A. A "Revenue Item" record
- B. An "Accounting Log" record
- C. A 'Transaction Delta" record
正解:C
質問 # 43
Which of the following "frequent tasks" would be found in the "System Administrator Workspace"?
- A. User Management
- B. Transaction Reconciliation
- C. Manage Accounts
正解:A
質問 # 44
......
最新(2024)Certinia PSA-Sysadmin試験問題集:https://www.goshiken.com/Certinia/PSA-Sysadmin-mondaishu.html