質問 41
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?
Note: There are 3 correct Answers to this question.
- A. It checks whether the sourcing in the Production Source Item Master Data type exists.
- B. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
- C. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
- D. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.
- E. It checks whether the required planning level master data exists for a subset of input key figures.
正解: C,D,E
質問 42
How can you check if key figure is editable or non-editable?
- A. Using the Edit View and then the Edit Planning View option
- B. Using the Key Figure Calculations app
- C. Using the Analytics Advanced app when selecting key figures
- D. Using the Web-based Planning app when selecting key figures
正解: D
質問 43
Which of the following stages can be modeled using scenarios from the S&OP planning cycle? Note:
There are 2 correct Answers to this question.
- A. Demand review
- B. Demand sensing stage
- C. Data input review for inventory
- D. Demand-supply balancing
正解: A,D
質問 44
You define fixing for a key figure. Which of the following functions are available for this key figure? Note:
There are 2 correct Answers to this question.
- A. Fixing is possible for system editable key figures.
- B. Fixing is possible for a certain period, including all child values in the hierarchy.
- C. Fixing is possible for a certain quantity of a key figure value.
- D. Fixing is possible for manually editable key figures.
正解: B,D
質問 45
You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed? Note: There are 2 correct Answers to this question.
- A. Finite heuristics can achieve demand prioritization and pegging.
- B. Prioritization of demand elements one by one is achieved by heuristics.
- C. Push and Pull production models are used by the optimizer.
- D. Planning results can be generated faster by the optimizer.
正解: A,C
質問 46
Which calculations can be processed within the pre-processing step in the forecasting model? Note:
There are 2 correct Answers to this question.
- A. Correlations can be evaluated.
- B. Rounding can be executed for the sales history.
- C. Promotion Sales Lift Ups can be deleted.
- D. Missing Values can be substituted.
正解: C,D
質問 47
You need to define a new logic for a key figure to drive values from the PERPRODCUSTREGION level to the PERPRODCUST level. Which of the following configuration options are possible for this process?
Note: There are 2 correct Answers to this question.
- A. Splitting the values from detailed to aggregated level by using copy operator
- B. Splitting the values from aggregated to detailed level based on stored split-factor key figure
- C. Splitting the values from aggregated to detailed level using multiplication by the proportions
- D. Splitting the values from aggregated to detailed level based on time profile attribute
正解: B,C
質問 48
How many different time levels can be selected within one planning view?
- A. All time levels available in the time profile
- B. All time levels available in the time profile, restricted by global configuration parameter
- C. Only base time levels of the planning area
- D. Only time levels from the base planning level of selected key figures
正解: B
質問 49
Which of the following key functions are supported by SAP IBP for sales and operations? Note: There are
2 correct Answers to this question.
- A. An advanced demand planning process
- B. Manual creation of feasible constrained plans
- C. A basic demand planning process
- D. Finite resource planning
正解: C,D
質問 50
Which of the following are features of the S&OP process templates? Note: There are 2 correct Answers to this question.
- A. Each step depicted in the template can have tasks associated with it.
- B. All process templates are assigned to dashboards.
- C. New instances of templates allow for re-use of the same processes again.
- D. The number of steps in a process template is the same for all implementations.
正解: A,C
質問 51
Which of the following functional areas are included in the out-of-the-box SAP Integrated Business Planning application for sales and operations? Note: There are 3 correct Answers to this question.
- A. Executive review
- B. Finite resource capacities planning
- C. Rough-cut supply planning
- D. Consensus demand planning
- E. Demand-driven materials requirement planning
正解: A,C,D
質問 52
You want to set up demand sensing to analyze demand changes in execution or close to execution windows. Which of the following conditions must you consider during the setup? Note: There are 2 correct Answers to this question.
- A. The result generates sensed demand data at the monthly time granularity for the full time horizon.
- B. Set up the forecast model to be executed at product-location level.
- C. At setup test the system to run the demand sensing (full) algorithm weekly and the demand sensing (update) on a daily basis.
- D. It is mandatory to load historical lag-based snapshot data.
正解: C,D
質問 53
You are redesigning planning for supply chain that is facing the issue of variability. What is the best solution for dampening variability via demand classification?
- A. SAP IBP for Sales and Operations Planning
- B. SAP IBP for Demand Driven Replenishment
- C. SAP IBP for Inventory
- D. SAP IBP for Demand
正解: B
質問 54
Which property of an attribute will allow it to be used as an attribute as a key figure?
- A. Type TIMESTAMP
- B. Type INTEGER
- C. Type NAVCHAR
- D. Type DECIMAL
正解: D
質問 55
Where can we see the results of Time Series analysis in SAP IBP?
- A. Time Series Property Attribute in Customer
- B. Time Series Property Attribute in Customer Product
- C. Time Series Property Attribute in Product
- D. Time Series Property Attribute in Customer Source
正解: C
質問 56
When can filter blocks appear in calculations? Note: There are 2 correct Answers to this question.
- A. When modeling attribute transformations
- B. When using IFISNULL statements in the formula
- C. When modeling attribute as a key figure
- D. When modeling cross-period calculations
正解: A,D
質問 57
You are configuring disaggregation for the KF1 key figure. Which methods can you apply? Note: There are 3 correct Answers to this question.
- A. Disaggregation in batch triggered by an application job
- B. An internal system-generated disaggregation
- C. Proportional disaggregation by using KF2 in the expression
- D. Disaggregation according to an equal split
- E. Disaggregation according to a user-defined expression
正解: C,D,E
質問 58
......