SAP C_ARSOR_2308問題集で100%カバー率リアル試験問題(更新された168問あります) [Q51-Q71]

Share

SAP C_ARSOR_2308問題集で100%カバー率リアル試験問題(更新された168問あります)

リアルC_ARSOR_2308問題集でリアルSAP問題集PDF

質問 # 51
When building a new term for your lot or line item, what is the purpose of the "Include in Cost" field?

  • A. Determines how the term is added to the formula
  • B. Includes another line for cost
  • C. Determines the acceptable value
  • D. Makes it visible to the participant

正解:A


質問 # 52
A sourcing project is created from a fully approved sourcing request. What data is copied from the sourcin request to the sourcing project?

  • A. Name
  • B. Commodity
  • C. Test project
  • D. Region

正解:B、D


質問 # 53
Which project types can contain custom header fields created within field configuration? Note: there are 3 correct answers to this question.

  • A. Contract workspace
  • B. Supplier registration questionnaire
  • C. Sourcing project
  • D. Knowledge project
  • E. Sourcing request

正解:A、C、E


質問 # 54
What are some of the benefits of requiring pre-bids during the preview period of an auction?

  • A. Suppliers can see their rank before the auction opens
  • B. Supplier can verify if they can supply the items as designed;
  • C. Suppliers can verify if they can supply the items at or below the starting price
  • D. Suppliers can review the number of suppliers participating in the auction
  • E. Suppliers can be restricted from participating in an action until they submit a starting price;

正解:B、C、E


質問 # 55
Which are the benefits of using advanced conditions instead of basic conditions? Note: there are 2 correct answers to this question.

  • A. Ability to assign conditional expression
  • B. Ability to apply conditions to specific suppliers
  • C. Ability to include multiple questions
  • D. Ability to use fields from the sourcing project header

正解:A、C


質問 # 56
Which steps are required to set up a total cost term? Note: there are 3 correct answers to this question.

  • A. Create a line item within the event
  • B. Access the sourcing Library for a list of approved terms
  • C. Set the answer type and acceptable value for all non-numeric terms
  • D. Designate if the term is an adder, subtracter, multiplier, or percentage discount
  • E. Add each term to the event template

正解:A、C、D


質問 # 57
During a sourcing process design workshop, a consultant identifies that the customer does NOT have any documented processes.

  • A. Escalate the issue to the project sponsors for resolutions
  • B. Use the goal and objectives identified in the project charter to promote a discussion about the customer current process
  • C. Facilitate a brainstorming session to elicit suggestions for improvement to the current process
  • D. Use the SAP Ariba Best Sourcing Practice template as the baseline template for developing the to-be process

正解:D


質問 # 58
Which tabs are unique to a published full sourcing project when compared to a published quick sourcin project?

  • A. Team
  • B. Overview
  • C. Tasks
  • D. Documents
  • E. History

正解:C、D、E


質問 # 59
Why would you run an RFI before conducting an RFP or an auction?

  • A. To verify if suppliers can meet the specifications
  • B. To gain a preliminary bid from each supplier
  • C. To narrow the list of suppliers to invite to later events;
  • D. To gather pricing and capability information

正解:A、C


質問 # 60
In a multistage event, what is the purpose of running an RFI before conducting an RFP or an auction? Note:
There are 2 correct answers to this question.

  • A. To verify if suppliers can meet the specifications
  • B. To narrow the list of suppliers to invite to later events
  • C. To gain a preliminary bid from each supplier
  • D. To gather pricing and capability information

正解:A、B


質問 # 61
Question 25: What preference needs to be set with a value of 1 or above to make content scorable?

  • A. Target grade
  • B. Importance
  • C. Weight
  • D. Overall percentage

正解:C


質問 # 62
What dashboard panel provides access to prepackaged reports?

  • A. My Documents
  • B. Common Actions
  • C. Action Tiles
  • D. Event Status

正解:B


質問 # 63
Which of the following event templates should be used whensourcing a commodity product that is a subject to frequent price fluctuations, and where participants bid in discounts relative to a baseline?

  • A. Traffic light auction
  • B. Reverse auction with a bid transformation
  • C. Total cost auction
  • D. Index-based auction

正解:D


質問 # 64
Which of the following integration options leverages comma-separated values (CSV) upload over HTTPS?

  • A. Mediated connectivity (Customer middleware)
  • B. SAP direct connectivity
  • C. Batch file channel transfer with the integration toolkit (ITK)
  • D. Web services (SOAP)

正解:C


質問 # 65
Which of the following methods can be used to add suppliers to a sourcing event? There are 2 correct answers to this question.

  • A. Search for suppliers using the Ul (Invite Participant button)
  • B. Added automatically from a test event
  • C. Added manually vie Excel import
  • D. Added automatically from an SAP Ariba Discovery posting

正解:A、C


質問 # 66
You are creating a new sourcing event.
When would you create and import event content via Microsoft Excel? Note: there are 2 correct answers to this question.

  • A. When an individual needs to contribute to content creation but does NOT have an SAP Ariba account
  • B. When loading translations to event content
  • C. When a supplier reports a technical issue and CANNOT submit their reponse
  • D. When creating a large number of lots

正解:A、D


質問 # 67
When should a customer identify the resources for each role on the client deployment team?

  • A. After the project charter is complete
  • B. Any time before the design is complete
  • C. During the pre-kickoff phase
  • D. As part of the kickoff meeting

正解:C


質問 # 68
Which action can the customer take if the ENABLEJTEMJ/ERSIONING parameter is active?

  • A. Store the History of BOM changes
  • B. Assign different versions of the same item to different users
  • C. Assign the BOM to different programs
  • D. Add different versions of the same material to sourcing events

正解:A


質問 # 69
Which pricing option is recommended when cost components in a line item vary by supplier and are not visible to participants?

  • A. Bid transformation
  • B. Price breakdown
  • C. Total cost
  • D. Alternative responses

正解:A


質問 # 70
What step of the Create Analytical Report process allows you to apply an initial filter before executing the report?

  • A. View Report
  • B. Pivot Layout
  • C. Source Data
  • D. Refine Data

正解:D


質問 # 71
......


SAP C_ARSOR_2308 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • イベント テンプレート ルールと、スコアリングなどの高度な機能を使用します。ワークフロー、プロジェクト、タスクを構成し、データを管理します。
トピック 2
  • イベント管理: 高度な機能
  • 承認ルールやソーシング要求など、ソーシング プロジェクトについて説明する
トピック 3
  • 直接材料の製品調達機能の説明、使用、管理
  • オークション タイプの定義、オークションのビジネス ケースの説明
トピック 4
  • プロジェクトの作成と管理
  • SAP Ariba Sourcing で使用できるさまざまなタイプのイベントを定義します

 

実際にあるGoShiken C_ARSOR_2308問題集PDFで100%合格率 保証付き:https://www.goshiken.com/SAP/C_ARSOR_2308-mondaishu.html

無料SAP C_ARSOR_2308試験問題と解答:https://drive.google.com/open?id=1FxqoqIvxae0zHjPEEiLdbr_ZU39ZRzuX