質問 # 14
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?
- A. EU_IMPORT_ALL
- B. EU_CLONE_MIG_DT_RUN
- C. EU_CLONE_MIG_SOT_RUN
- D. EU_CLONE_MIG_DT_CREATE
正解:B
質問 # 15
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.
- A. Kernel for source release, Windows, SAP MaxDB
- B. Kernel for target release, Linux, SAP HANA
- C. Kernel for target release, Windows, SAP MaxDB
- D. Kernel for target release, Windows, SAP HANA
正解:A、D
質問 # 16
What is the benefit of using the file UPGANA.XML from a previous SUM run?
Please choose the correct answer.
Response:
- A. To repeat specific phases during the SUM run
- B. To make the progress information within SUM UI more accurate
- C. To auto-fill specific fields on selected screens on the SUM UI
- D. To skip selected phases during the SUM run
正解:B
質問 # 17
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:
- A. An additional temporary database is used during uptime
- B. The repository is migrated in uptime
- C. Dedicated application tables are migrated in uptime
- D. TABIMJJPG is executed in uptime
正解:C
質問 # 18
You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)?
Please choose the correct answer.
- A. Credentials of a named user in the development client of the development system
- B. Credentials of user DDIC in the development client of the development system
- C. Credentials of user DDIC in client 000 of the shadow system
- D. Credentials of a named user in client 000 of the shadow system
正解:A
質問 # 19
Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?
- A. Downtime conversion
- B. Shadow on target creation
- C. Downtime migration
- D. Silent data migration (SDM)
正解:C
質問 # 20
You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?
- A. The end of the database migration
- B. The end of the business downtime
- C. The start of the business downtime
- D. The start of the Execution roadmap step
正解:B
質問 # 21
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:
- A. Modification adjustment (SPDD)
- B. Switch to new repository (EU_SWITCH)
- C. Conversion of application tables (PARCONV_UPG)
- D. Activation of dictionary objects (ACT_UPG)
正解:A、D
質問 # 22
You are executing as SAP S/4HANA Conversion with scenario strategy Standard. When will the shadow instance be stopped for the last time?
- A. Before the downtime starts
- B. At the end
- C. As part of the cleanup process
- D. Early in the downtime
正解:B
質問 # 23
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:
- A. Specify the business functions that need to be switched on during the prepare part of SUM.
- B. Activate the required business functions manually in the production system.
- C. Import a transport request from the development system that contains the recording of the activation.
- D. During conversion, SUM delivers some business functions already activated.
正解:C、D
質問 # 24
ICNV initialization does 3
- A. AA
- B. Creation of flag
- C. Creation of views
- D. Build index on flag column
正解:B、C、D
質問 # 25
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?
- A. To optimize the activation
- B. To optimize the conversion
- C. To optimize the migration
- D. To optimize the main import
正解:C
質問 # 26
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:
- A. Shadow repository creation (EU_IMPORT*)
- B. ParaUel distribution (PARDIST_SHD)
- C. Uptime migration (EU_CLONE_MIG_UT_RUN)
- D. Downtime migration (EU_CLONE_MIG_DT_RUN)
正解:C
質問 # 27
You have selected "Standard" as scenario strategy in the SUM tool. Which steps take place via the shadow instance? Note: There are 2 correct answers to this question.
- A. Modification adjustment (SPDD)
- B. Modification adjustment (SPAU)
- C. Conversion of application tables (PARCONV_UPG)
- D. Activation of dictionary objects (ACT_UPG)
正解:A、D
質問 # 28
You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.
- A. Main import
- B. Migration
- C. Software update
- D. Conversion
正解:B、D
質問 # 29
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:
- A. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
- B. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.
- C. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
- D. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
正解:A
質問 # 30
In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2 correct answers to this question.
- A. When performing an SAP S/4HANA conversion with DMO
- B. When performing an SAP S/4HANA conversion without u DMO
- C. When upgrading an SAP ECC system with DMO
- D. When upgrading an SAP S/4HANA Server system
正解:C、D
質問 # 31
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
Response:
- A. An upgrade of the software components is performed, without changing the database type.
- B. A change of the database type is performed, without changing the software components.
- C. An SAP S/4HANA conversion is performed, without adapting the customer data.
- D. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
正解:B
質問 # 32
......