[2024年06月17日]E-S4HCON2023究極な学習ガイド [Q37-Q59]

Share

[2024年06月17日]E-S4HCON2023究極な学習ガイド

究極なガイドで準備E-S4HCON2023認定試験SAP Certified Technology Specialistは2024年更新

質問 # 37
You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)?
Please choose the correct answer.

  • A. Credentials of a named user in client 000 of the shadow system
  • B. Credentials of user DDIC in client 000 of the shadow system
  • C. Credentials of user DDIC in the development client of the development system
  • D. Credentials of a named user in the development client of the development system

正解:D


質問 # 38
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

正解:A


質問 # 39
You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?

  • A. The end of the database migration
  • B. The start of the Execution roadmap step
  • C. The start of the business downtime
  • D. The end of the business downtime

正解:D


質問 # 40
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.

  • A. It explains where to find information about the custom code analysis.
  • B. It is a database-specific document.
  • C. It explains the database migration option (DMO) of SUM.
  • D. It contains a section about the simplification item (SI) checks.

正解:A、D


質問 # 41
Which Guides contain information about SUM phases starting with "EU_CLONE_"?
There are 2 correct answers to this question.
Response:

  • A. The major SUM Guide
  • B. The SAP S/HANA Conversion Guide
  • C. The DMO Guide
  • D. The Application Guide

正解:B、C


質問 # 42
Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?

  • A. Near-Zero Downtime Maintenance (nZDM)
  • B. Downtime Optimized Data Conversion (DoC)
  • C. Downtime Optimized DMO (DoDMO)
  • D. Near-Zero Downtime Technology (NZDT)

正解:D


質問 # 43
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step
"Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:

  • A. The SAP Support Packages found in the download directory
  • B. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
  • C. The SAP Support Packages contained in the upgrade media
  • D. The SAP Support Packages that will be bound to the upgrade

正解:A


質問 # 44
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:

  • A. Using the main configuration option "Standard" when applying SAP Support Packages
  • B. Using the main configuration option "Single System" in case of an upgrade.
  • C. Using the database migration option (DMO) for SUM
  • D. Using the main configuration option "Single System" when installing an Add-On

正解:D


質問 # 45
Which are valid options to check the progress of the database migration in a Microsoft Windows environment?
There is correctanswers to this question.
Response:

  • A. Check the "Charts Control Center" in the SUM UI
  • B. Check the log files written under "SUM\abap\log"
  • C. Check the dump size of the database export on disk
  • D. Check logs for jobs starting with "RSUPG_SGEN" in the system

正解:A、B


質問 # 46
You are starting an SAP S/4HANA Conversion. The scenario strategy Downtime Optimized Conversion (DoC) is NOT selectable.What could be the reason?

  • A. The start release is too old for DOC.
  • B. The SAP S/4HANA Conversion is without DMO.
  • C. The source database is not supported
  • D. The SAP S/4HANA Conversion includes a DMO.

正解:C


質問 # 47
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:

  • A. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
  • B. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
  • C. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
  • D. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps

正解:B


質問 # 48
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:

  • A. SUM without DMO
  • B. SWPM using the Backup / Restore procedure
  • C. SWPM using the Load procedure
  • D. SUM with DMO

正解:C


質問 # 49
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:

  • A. Shadow repository creation (EU_IMPORT*)
  • B. ParaUel distribution (PARDIST_SHD)
  • C. Uptime migration (EU_CLONE_MIG_UT_RUN)
  • D. Downtime migration (EU_CLONE_MIG_DT_RUN)

正解:C


質問 # 50
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?

  • A. During the Execution roadmap step
  • B. During the SUM technical downtime
  • C. Before the start of the SUM technical downtime
  • D. After SUM has ended

正解:B


質問 # 51
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.
  • B. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
  • C. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
  • D. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.

正解:B


質問 # 52
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:

  • A. Perform the migration of data into the new data structure
  • B. Check the compatibility of custom code with SAP S/4HANA
  • C. Apply the recommendations of the simplification list
  • D. Run the database migration to the SAP HANA database

正解:B、C


質問 # 53
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.

  • A. A
  • B. DMO can only be run with systems NW740 or NW731
  • C. Target DB size will increase temporarily

正解:B、C


質問 # 54
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:

  • A. Specify the business functions that need to be switched on during the prepare part of SUM.
  • B. During conversion, SUM delivers some business functions already activated.
  • C. Import a transport request from the development system that contains the recording of the activation.
  • D. Activate the required business functions manually in the production system.

正解:B、C


質問 # 55
What is the benefit of using the file UPGANA.XML from a previous SUM run?
Please choose the correct answer.
Response:

  • A. To make the progress information within SUM UI more accurate
  • B. To auto-fill specific fields on selected screens on the SUM UI
  • C. To skip selected phases during the SUM run
  • D. To repeat specific phases during the SUM run

正解:A


質問 # 56
You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:

  • A. At the end of the downtime
  • B. As part of the cleanup process
  • C. Before the downtime starts
  • D. Early in the downtime

正解:C


質問 # 57
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.

  • A. Release upgrade
  • B. Homogenous system copy
  • C. Support Package Stack update
  • D. Dual Stack split
  • E. Database migration

正解:A、C、E


質問 # 58
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:

  • A. Using DMO when applying Support Packages to SAP ECC 6.07
  • B. Upgrading to SAP ECC 6.08 without using DMO
  • C. Updating to SAP ECC 6.07 using DMO
  • D. SAP S/4HANA conversion to SAP S/4HANA 1709

正解:B、D


質問 # 59
......

SAP Certified Technology Specialist基礎問題E-S4HCON2023試験練習問題集:https://www.goshiken.com/SAP/E-S4HCON2023-mondaishu.html

リアルE-S4HCON2023問題集でSAP明確な解答を試そう:https://drive.google.com/open?id=11a9QZYaHFjRM5Pxg8joUPyt2qWsZxs1c