ガイド(2022年最新)実際のSAP E-S4HCON2022試験問題
E-S4HCON2022試験問題集合格させるのは更新されたのは2022年年最新の認証済み試験問題
質問 16
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.
- A. Kernel for target release, Windows, SAP HANA
- B. Kernel for target release, Linux, SAP HANA
- C. Kernel for source release, Windows, SAP MaxDB
- D. Kernel for target release, Windows, SAP MaxDB
正解: A,C
質問 17
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?
- A. Before the start of the SUM technical downtime
- B. During the Execution roadmap step
- C. After SUM has ended
- D. During the SUM technical downtime
正解: D
質問 18
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
There are 2 correct answers to this question.
Response:
- A. In the corresponding R3trans log files of this phase
- B. In the job log for the corresponding job in SM37 (Job Overview)
- C. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log
- D. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
正解: B,C
質問 19
Which Guides contain information about SUM phases starting with "EU_CLONE_"?
There are 2 correct answers to this question.
Response:
- A. The major SUM Guide
- B. The DMO Guide
- C. The Application Guide
- D. The SAP S/HANA Conversion Guide
正解: B,D
質問 20
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues?
There are 2 correct answers to this question.
Response:
- A. Assign the transport request as a modification adjustment transport
- B. Manually activate the adjusted dictionary objects
- C. Release the transport request containing the modification adjustment
- D. Create "modified* versions of the objects that you need to adjust
正解: A,D
質問 21
You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.
- A. Migration
- B. Software update
- C. Main import
- D. Conversion
正解: A,D
質問 22
Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?
- A. Downtime Optimized Data Conversion (DoC)
- B. Downtime Optimized DMO (DoDMO)
- C. Near-Zero Downtime Technology (NZDT)
- D. Near-Zero Downtime Maintenance (nZDM)
正解: C
質問 23
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:
- A. Import of dictionary objects from the download directory in phase DDIC_UPG
- B. Activation of dictionary objects in phase ACT_UPG
- C. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
- D. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
- E. Import of upgrade and language data from the download directory in phase TABIM UPG
正解: A,B,E
質問 24
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:
- A. By searching for transport requests in DIR_TRANS, subdirectory "transport"
- B. By searching for transport requests named <SID>K0<number>
- C. By searching for transport requests that are assigned to the project SAP_ADJUST
- D. By searching for transport requests in the file umodauto.Ist
正解: D
質問 25
You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox?
Please choose the correct answer.
Response:
- A. /ASU/START (Start ASU Toolbox)
- B. /ASU/SHOW_NOTE (Show SAP Note via Web-Browser)
- C. /ASU/SSM (ASU Simple Schedule Manager)
- D. /ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode)
正解: A
質問 26
During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?
- A. SUM continues with the next phase and your modifications are lost
- B. SUM continues with the next phase and your modifications are kept as In the start release
- C. SUM refuses to continue unless you have marked a transport request as modification adjustment transport
- D. Before continuing with the next phase SUM asks for a modification adjustment transport
正解: B
質問 27
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:
- A. It is target release specific
- B. It is a database-specific document
- C. It contains a troubleshooting section
- D. It contains a section "free space requirements"
正解: A,D
質問 28
During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?
There are 2 correct answers to this question.
Response:
- A. Check for running R31oad processes on the host of the primary application server
- B. Check for running batch jobs in the shadow system via Job Overview (SM37)
- C. Check for running R3trans processes on the host of the primary application server
- D. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
正解: C,D
質問 29
What is the benefit of using the file UPGANA.XML from a previous SUM run?
Please choose the correct answer.
Response:
- A. To repeat specific phases during the SUM run
- B. To skip selected phases during the SUM run
- C. To auto-fill specific fields on selected screens on the SUM UI
- D. To make the progress information within SUM UI more accurate
正解: D
質問 30
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:
- A. Check the compatibility of custom code with SAP S/4HANA
- B. Perform the migration of data into the new data structure
- C. Run the database migration to the SAP HANA database
- D. Apply the recommendations of the simplification list
正解: A,D
質問 31
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
Please choose the correct answer.
Response:
- A. It performs a comparison on all tables using row counts.
- B. It does NOT perform any table comparison.
- C. It performs a comparison on selected tables using check sum.
- D. It performs a comparison of all tables using check sum.
正解: A
質問 32
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
There are 2 correct answers to this question.
Response:
- A. Reuse a profile for the shadow instance from a previous run.
- B. Use the Near Zero Downtime Maintenance Technology (NZDM).
- C. Choose the instance number of the shadow instance.
- D. Keep archiving on during the whole procedure.
正解: A,C
質問 33
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?
- A. A Standalone SAP system with ABAP 7.51 or above
- B. An SAP S4HANA 1709 sandbox system
- C. AA
正解: A,B
質問 34
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:
- A. ATC (ABAP Test Cockpit)
- B. SYCM (Simplification Database Content)
- C. SE80 (Object Navigator)
- D. SAT (Runtime Analysis)
正解: A,C
質問 35
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:
- A. SUM without DMO
- B. SWPM using the Load procedure
- C. SUM with DMO
- D. SWPM using the Backup / Restore procedure
正解: B
質問 36
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?
- A. To optimize the main import
- B. To optimize the conversion
- C. To optimize the migration
- D. To optimize the activation
正解: C
質問 37
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:
- A. Using DMO when applying Support Packages to SAP ECC 6.07
- B. SAP S/4HANA conversion to SAP S/4HANA 1709
- C. Upgrading to SAP ECC 6.08 without using DMO
- D. Updating to SAP ECC 6.07 using DMO
正解: B,C
質問 38
You are performing an S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of dictionary objects (SPDD)?
Please choose the correct answer.
Response:
- A. Credentials of a named user in client 000 of the shadow system
- B. Credentials of user DDIC in client 000 of the shadow system
- C. Credentials of user DDIC in the development client of the development system
- D. Credentials of a named user in the development client of the development system
正解: A
質問 39
What are the benefits of using the Benchmarking option of the DMO for SUM?
There are 2 correct answers to this question.
Response:
- A. You can obtain migration duration files that can be used to optimize the next runs from a previous benchmark run.
- B. You can record the modification adjustment during migration and use the transports in the next runs.
- C. You can verify that the content of the download directory matches the stack.XML file.
- D. You can find the optimal number of parallel R31oad processes by monitoring host performance.
正解: B,D
質問 40
......