[Q17-Q40] 100%合格率保証付きで最高のE-S4HCON2022試験でリアル問題PDFがある[2022年02月]

Share

100%合格率保証付きで最高のE-S4HCON2022試験でリアル問題PDFがある[2022年02月]

E-S4HCON2022問題集で2022年最新のSAP E-S4HCON2022試験問題

質問 17
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.

  • A. DMO can only be run with systems NW740 or NW731
  • B. A
  • C. Target DB size will increase temporarily

正解: A,C

 

質問 18
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.

  • A. It is a database-specific document.
  • B. It explains the database migration option (DMO) of SUM.
  • C. It explains where to find information about the custom code analysis.
  • D. It contains a section about the simplification item (SI) checks.

正解: C,D

 

質問 19
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

  • A. TABIMJJPG is executed in uptime
  • B. The repository is migrated in uptime
  • C. An additional temporary database is used during uptime
  • D. Dedicated application tables are migrated in uptime

正解: D

 

質問 20
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

正解: B

 

質問 21
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:

  • A. Breakpoint configuration file SAPUPPHAS.BRK
  • B. MIGRATE J5T_DUR_XML file from a previous run
  • C. Stack XML file calculated by the Maintenance Planner
  • D. Parameter file SAPup_add.par

正解: B,C

 

質問 22
Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?

  • A. Downtime migration
  • B. Shadow on target creation
  • C. Downtime conversion
  • D. Silent data migration (SDM)

正解: A

 

質問 23
Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.

  • A. SAP S/4HANA conversion without DMO
  • B. SAP S/4HANA conversion including DMO
  • C. Benchmark tool
  • D. Prerequisite check
  • E. DMO without system update

正解: A,B,D

 

質問 24
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:

  • A. Using DMO when applying Support Packages to SAP ECC 6.07
  • B. SAP S/4HANA conversion to SAP S/4HANA 1709
  • C. Upgrading to SAP ECC 6.08 without using DMO
  • D. Updating to SAP ECC 6.07 using DMO

正解: B,C

 

質問 25
Which Guides contain information about SUM phases starting with "EU_CLONE_"?
There are 2 correct answers to this question.
Response:

  • A. The major SUM Guide
  • B. The DMO Guide
  • C. The Application Guide
  • D. The SAP S/HANA Conversion Guide

正解: B,D

 

質問 26
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:

  • A. Import a transport request from the development system that contains the recording of the activation.
  • B. Activate the required business functions manually in the production system.
  • C. During conversion, SUM delivers some business functions already activated.
  • D. Specify the business functions that need to be switched on during the prepare part of SUM.

正解: A,C

 

質問 27
You are running an SAP ECC system. For which of the following activities does SUM allow you to use the Near Zero Downtime Maintenance (NZDM) capabilities?
There are 3 correct answers to this question.
Response:

  • A. Perform an SAP S/4HANA conversion including DMO.
  • B. Upgrade the SAP system.
  • C. Apply SAP Support Packages.
  • D. Use DMO for SUM.
  • E. Apply an Enhancement Package.

正解: B,C,E

 

質問 28
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:

  • A. Downtime migration (EU_CLONE_MIG_DT_RUN)
  • B. Uptime migration (EU_CLONE_MIG_UT_RUN)
  • C. ParaUel distribution (PARDIST_SHD)
  • D. Shadow repository creation (EU_IMPORT*)

正解: B

 

質問 29
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

  • A. Unicode conversion Database migration SAP S/4HANA conversion without database migration
  • B. Unicode conversion SAP S/4HANA conversion including database migration
  • C. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration
  • D. Unicode conversion SAP S/4HANA conversion without database migration Database migration
  • E. SAP S/4HANA conversion including database migration and Unicode conversion

正解: A,B,C

 

質問 30
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
  • B. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
  • C. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
  • D. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.

正解: A

 

質問 31
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:

  • A. Using the main configuration option "Single System" in case of an upgrade.
  • B. Using the main configuration option "Single System" when installing an Add-On
  • C. Using the main configuration option "Standard" when applying SAP Support Packages
  • D. Using the database migration option (DMO) for SUM

正解: B

 

質問 32
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:

  • A. SUM without DMO
  • B. SWPM using the Load procedure
  • C. SUM with DMO
  • D. SWPM using the Backup / Restore procedure

正解: B

 

質問 33
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?

  • A. Before the start of the SUM technical downtime
  • B. During the Execution roadmap step
  • C. After SUM has ended
  • D. During the SUM technical downtime

正解: D

 

質問 34
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
There are 2 correct answers to this question.
Response:

  • A. Reuse a profile for the shadow instance from a previous run.
  • B. Use the Near Zero Downtime Maintenance Technology (NZDM).
  • C. Choose the instance number of the shadow instance.
  • D. Keep archiving on during the whole procedure.

正解: A,C

 

質問 35
You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)?
Please choose the correct answer.

  • A. Credentials of user DDIC in client 000 of the shadow system
  • B. Credentials of a named user in client 000 of the shadow system
  • C. Credentials of a named user in the development client of the development system
  • D. Credentials of user DDIC in the development client of the development system

正解: C

 

質問 36
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?

  • A. The link to different patch levels to SUM
  • B. An overview about possible upgrade paths
  • C. The corrections to the SUM Guide
  • D. AA

正解: A,B,C

 

質問 37
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:

  • A. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
  • B. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
  • C. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
  • D. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.

正解: C

 

質問 38
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:

  • A. Delete client 066 (Early Watch Client)
  • B. Uninstall Fiori apps not released for SAP_UI 7.50
  • C. Uninstall industry extensions not supported by SAP S/4HANA
  • D. Install add-on SAP Gateway 7.50

正解: A,B

 

質問 39
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:

  • A. The SAP Support Packages that will be bound to the upgrade
  • B. The SAP Support Packages found in the download directory
  • C. The SAP Support Packages contained in the upgrade media
  • D. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner

正解: B

 

質問 40
......

無料E-S4HCON2022別格な問題集をダウンロード:https://www.goshiken.com/SAP/E-S4HCON2022-mondaishu.html

E-S4HCON2022合格保証がつく問題集で合格できるE-S4HCON2022試験:https://drive.google.com/open?id=1iUia7cO1NkjA_E74yJyliSNGbxphtqMm