質問 # 21
You want to understand why cost are collected on sales order item level. What do you need to in the configuration? Note: There are 3 correct answers to this question.
- A. Requirement type
- B. Account assignment category
- C. Costing type
- D. Valuation variant
- E. Requirements class
正解:A、B、E
質問 # 22
Which type of Profitability Analysis updates the cost of goods sold at the time of delivery?
- A. Both account-based and costing-based
- B. Account-based only
- C. Costing-based only
- D. Periodic-accounting based
正解:B
質問 # 23
You have implemented Product Cost by Sales Oder in conjunction with revenue-based results analysis in your organization.
For a particular sales order item, you have the following:
Plan revenue = 3000; Plan costs = 2000
Actual revenue = 1200; Actual costs = 1000
What data does the system calculate during results analysis?
- A. Revenue = 1200; Cost of sales = 1000; Reserve = 200
- B. Revenue = 1200; Cost of sales = 800; Reserve = 200
- C. Revenue = 1200; Cost of sales = 1000; WIP = 200
- D. Revenue = 1200; Cost of sales = 800; WIP = 200
正解:D
質問 # 24
You want to derive the profitability segment for a line item in the universal journal using SAP S/4HANA standard configuration. What requirements must be fulfilled? Note: There are 2 correct answers to this question.
- A. The type of the general ledger account must be primary cost/revenue or secondary cost.
- B. Account-based Profitability Analysis must be active.
- C. Costing-based Profitability Analysis must be active.
- D. The type of the addressed ledger must be an extension ledger.
正解:A、B
質問 # 25
You create a new profit center. Which company code(s) is it assigned to by default?
- A. All company codes where profit center accounting is activated.
- B. All company codes to which the profit center standard hierarchy is assigned to.
- C. All company codes within the controlling area.
- D. All company codes maintained in your authorization profile.
正解:C
質問 # 26
What are some of the characteristics of planning for internal orders? Note: There are 2 correct answers to this question.
- A. Availability control can check against plan values.
- B. You can enter costs and revenues.
- C. You can define tolerance limits for plan overspend.
- D. You can plan multiple versions.
正解:B、D
質問 # 27
You want to determine which operations of the routing should be considered in a product cost calculation.
How do you do this? Note: There are 2 correct answers to this question.
- A. By marking the Relevance to Costing indicator in the operation
- B. By marking the cost indicator in the control key assigned to the operation
- C. By assigning a cost center to the work center in the operation
- D. By defining a usage key in the header of the routing.
正解:A、B
質問 # 28
Why would you use manual cost allocation in Controlling? Note: There are 2 correct answers to this question.
- A. To run simple allocations of actual data
- B. To correct secondary postings
- C. To allocate costs using an allocation cycle
- D. To run simple allocations of plan data
正解:A、B
質問 # 29
Which of the following statements best describe Product Cost by Order? Note: There are 2 correct answers to this question.
- A. It is used when you perform repetitive manufacturing.
- B. It is used when controlling by individual production lots or discrete quantities is needed.
- C. It is used when full cost traceability is needed.
- D. It is recommended for products with a long production time.
正解:B、C
質問 # 30
What can you do with statistical internal orders?
- A. Transfer posting to another internal order.
- B. Simultaneously post to a cost center.
- C. Apply overhead rates to the internal order.
- D. Settle costs to a cost center.
正解:B
質問 # 31
You are considering using commitment management with internal orders. What do you need to do in the configuration?
- A. Activate commitment management only in the controlling area.
- B. Activate commitment management in the controlling area, the order type, and in individual internal order master data.
- C. Activate commitment management in both the version and the order type.
- D. Activate commitment management in both the controlling area and the order type.
正解:D
質問 # 32
You want to setup integrated planning for your internal order. What do you need to do? Note: There are 2 correct answers to this question.
- A. Set the relevant indicator in the controlling area.
- B. Set the relevant indicators in the CO version.
- C. Set the relevant indicator in the internal order master record.
- D. Set the relevant indicator in the planning profile of the order type.
正解:B、C
質問 # 33
In SAP S/4HANA, you have decided to activate only account-based profitability analysis for your organization. You want to settle costs and revenue of a sales order item to a profitability segment. What do you need to configure?
- A. PA transfer structure
- B. Source structure
- C. Allocation structure
- D. Cost component structure
正解:A
質問 # 34
Which of the following steps are part of the procedure to update the standard price of the material? Note:
There are 2 correct answers to this question.
- A. Release the cost estimate.
- B. Mark the cost estimate.
- C. Split the costs.
- D. Archive the cost estimates.
正解:A、B
質問 # 35
What are the prerequisites for automatic generation of the settlement rule to a market segment for a sales order item? Note: There are 2 correct answers to this question.
- A. Profitability Analysis (CO-PA) is activated.
- B. The sales order item is a cost object.
- C. The material in the sales order item is a service.
- D. The sales order item is assigned to a project.
正解:A、D
質問 # 36
What parameters can you set up when defining order types?
- A. Define document type.
- B. Define default parameters for master record fields.
- C. Allow revenue postings.
- D. Define source structure.
正解:B、C
質問 # 37
How do you maintain number range intervals in Controlling?
- A. By account type
- B. By business transactions
- C. By cost element category
- D. By document type
正解:B
質問 # 38
Which statements are relevant to the cost of sales accounting method in profitability management? Note:
There are 2 correct answers to this question.
- A. It aims to match revenues for goods and services against sales-related expenses.
- B. It presents the costs and revenues information in a format that is ideal for conducting margin analyses.
- C. It presents revenues, primary expenses, changes in stock, WIP, and capitalized activities.
- D. It aims to summarize activity and situational change for a given organizational unit over a period of time.
正解:A、B
質問 # 39
Which of the following statements best describe Product Cost by Period? Note: There are 2 correct answers to this question.
- A. It is used to analyze work in process (WIP) based on actual costs.
- B. It is used in conjunction with a product cost collector.
- C. It is used when periodic costs outweigh daily postings.
- D. It is used when the focus of controlling is on a stable and continuous production process.
正解:B、D
質問 # 40
You are implementing SAP S/4HANA and you want to run analytical reports off a single data model. Which statement best describes reporting in SAP S/4HANA?
- A. Reporting can be either broad and deep for analysis, or speedy and simple, but not both.
- B. Reporting on data in real time is difficult, and complex to design.
- C. Reporting on data is available in real-time at every level of detail.
- D. Reporting analytical data is always done in a business warehouse system.
正解:C
質問 # 41
In which module do you process profit center allocations in SAP S/4HANA?
- A. Product cost accounting
- B. Cost center accounting
- C. Account-based profitability analysis
- D. General ledger accounting
正解:D
質問 # 42
Which setting in the cost center master data do you use to assign the same attributes to similar cost center?
- A. Standard hierarchy node
- B. Cost center type
- C. Cost center category
- D. Object class
正解:C
質問 # 43
You have implemented Product Cost by Sales Oder in conjunction with cost-based POC results analysis in your organization.
For a particular sales order item, you have the following:
Plan revenue = 3000; Plan costs = 2000
Actual revenue = 1200; Actual cost=1000
What data does the system calculate during results analysis?
- A. "Revenue = 1500; Cost of sales = 1000; Capitalized revenue (revenue in excess of billings) = 300"
- B. "Revenue = 1500; Cost of sales = 1000; Revenue surplus =300"
- C. "Revenue = 1200; Cost of sales = 1000; Revenue surplus =200"
- D. "Revenue = 1200; Cost of sales = 1000; Capitalized revenue (revenue in excess of billings) = 200"
正解:A
質問 # 44
......
SAP C_TS4CO_2021認定試験は、管理会計アソシエイトのSAP S/4HANAで知識とスキルを実証したい専門家向けに設計されています。この認定は、会計と金融の強力なバックグラウンドを持ち、SAP S/4HANAでのスキルを向上させることを目指している個人に最適です。この認定には、コストセンターの会計、製品の原価計算、収益性分析など、さまざまなトピックが含まれています。
2023年最新の実際にある検証済みのC_TS4CO_2021問題集:https://www.goshiken.com/SAP/C_TS4CO_2021-mondaishu.html
合格させるC_TS4CO_2021試験で更新された82問題あります:https://drive.google.com/open?id=1B05SPgSZcH-saVSKZ8N_SaMJazgs5IHi