質問 # 16
Which of the following values can be calculated using result analysis? Note: There are 3 correct answers to this question.
- A. Work in progress
- B. Cost of goods manufactured
- C. Reserves for unrealized costs
- D. Gross margin
- E. Cost of sales
正解:A、C、E
質問 # 17
Why would you use manual cost allocation in Controlling? Note: There are 2 correct answers to this question.
- A. To allocate costs using an allocation cycle
- B. To run simple allocations of actual data
- C. To run simple allocations of plan data
- D. To correct secondary postings
正解:B、D
質問 # 18
How can you configure the transfer price solution in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Use separate currency types within the same ledger for each valuation.
- B. Use separate segments for each valuation.
- C. Use separate ledgers for each valuation.
- D. Use separate CO versions for each valuation.
正解:C、D
質問 # 19
You are running an indirect activity allocation. What do you post to the sender and receiver?
- A. You post quantity and cost to both the sender and receiver.
- B. You post only cost to both the sender and receiver.
- C. You post both quantity and cost to the sender, and cost only to the receiver.
- D. You post both quantity and cost to the receiver, and cost only to the sender.
正解:A
質問 # 20
What can you do with statistical internal orders?
- A. Apply overhead rates to the internal order.
- B. Settle costs to a cost center.
- C. Simultaneously post to a cost center.
- D. Transfer posting to another internal order.
正解:C
質問 # 21
At what level do you create the structure of the operating concern?
- A. Company code level
- B. Sales organization level
- C. Client level
- D. Controlling area level
正解:C
質問 # 22
What do you need to setup in order to bring the values incoming sales orders into account-based Profitability Analysis?
- A. A multi-valuation ledger
- B. An extension ledger of type "Simulation"
- C. An extension ledger of type "Prediction and Commitment"
- D. A new standard G/L ledger with exclusive usage of "Prediction"
正解:C
質問 # 23
What parameters can you set up when defining order types?
- A. Define source structure.
- B. Allow revenue postings.
- C. Define default parameters for master record fields.
- D. Define document type.
正解:B、C
質問 # 24
To which object do you assign a costing sheet?
- A. Transfer control
- B. Cost component structure
- C. Costing variant
- D. Valuation variant
正解:D
質問 # 25
Which statements are relevant to the cost of sales accounting method in profitability management? Note:
There are 2 correct answers to this question.
- A. It presents the costs and revenues information in a format that is ideal for conducting margin analyses.
- B. It presents revenues, primary expenses, changes in stock, WIP, and capitalized activities.
- C. It aims to match revenues for goods and services against sales-related expenses.
- D. It aims to summarize activity and situational change for a given organizational unit over a period of time.
正解:A、C
質問 # 26
Which of the following objects can be selected in templates for activity-based costing? Note: There are 2 correct answers to this question.
- A. Cost center/activity type
- B. Internal order
- C. WBS element
- D. Business process
正解:B、C
質問 # 27
What are the some of the characteristics of Profit Center Accounting in SAP S4/HANA? Note: There are 2 correct answers to this question.
- A. It can be used with period and/or cost of sale accounting.
- B. It can be used in the settlement rule for internal order.
- C. It is integrated in the universal journal.
- D. It is possible to derive the profit center from the segment in configuration.
正解:A、C
質問 # 28
What does SAP/S4HANA select line-item-based data for costing based Profitability Analysis reports?
- A. It select actual data from table CE2XXXX and plan data from CE3XXXX.
- B. It select actual data from table CE1XXXX and plan data from CE2XXXX.
- C. It select actual data from table ACDOCA and plan data from COSP.
- D. It select actual data from table ACDOCA and plan data from ACDOCP.
正解:B
質問 # 29
In the material master record there are three planned prices: ""Planned price 1"", ""Planned price
2""and""Planned price 3"". What do you use them for?
- A. To valuate the materials in cost estimates
- B. To update the standard price during the release of a standard cost estimate
- C. To valuate goods movement
- D. To valuate material stocks
正解:A
質問 # 30
Which scenarios can be covered by one single costing run? Note: There are 2 correct answers to this question.
- A. Current cost estimate of all the materials in all controlling area
- B. Product cost collector cost estimate in one plant
- C. Standard cost estimate of all the materials in all plants of a controlling area
- D. Inventory cost estimate of all the materials in one plant
正解:B、D
質問 # 31
How do you maintain number range intervals in Controlling?
- A. By business transactions
- B. By account type
- C. By document type
- D. By cost element category
正解:A
質問 # 32
At which level do you define the valuation method for results analysis?
- A. Operating concern
- B. Plant
- C. Company code
- D. Controlling area
正解:D
質問 # 33
What can you manage via the account assignment category? Note: There are 2 correct answers to this question.
- A. Separate sales order stock
- B. Product cost by sales order
- C. Costing variant
- D. Valuation of separate sales order stock
正解:A、D
質問 # 34
Which of the following statements best describe Product Cost by Period? Note: There are 2 correct answers to this question.
- A. It is used when periodic costs outweigh daily postings.
- B. It is used in conjunction with a product cost collector.
- C. It is used when the focus of controlling is on a stable and continuous production process.
- D. It is used to analyze work in process (WIP) based on actual costs.
正解:B、C
質問 # 35
How do you define the relationship between an operating concern and a controlling area?
- A. One-to-many (1:N)
- B. Many-to-one (N:1)
- C. One-to-one (1:1)
- D. Many-to-many (N:M)
正解:A
質問 # 36
You want to create cost centers for your company. What is the prerequisite to build an organizational structure for overhead cost controlling?
- A. Profit center
- B. Cost center categories
- C. Standard hierarchy top node
- D. Person responsible
正解:C
質問 # 37
Which parameters are controlled by the costing type in a costing variant? Note: There are 2 correct answers to this question.
- A. Costing sheet
- B. Price updates
- C. Save with date key
- D. Price for materials
正解:B、C
質問 # 38
You would like to allocate primary and secondary costs from a cost center to another cost center. Which allocation method will you use?
- A. Periodic reposting
- B. Assessment
- C. Direct activity allocation
- D. Distribution
正解:B
質問 # 39
......
SAP C_TS4CO_2021試験の準備をするために、候補者はSAPが提供するさまざまなトレーニングリソースを利用できます。これらのリソースには、eラーニングコース、教室でのトレーニング、認定学習資料が含まれます。候補者は、SAPのオンラインコミュニティからも恩恵を受けることができます。これは、知識を共有し、質問をする、他のSAPの専門家からのアドバイスを求めるプラットフォームを提供します。
最新のC_TS4CO_2021学習ガイド2023年最新の- 提供するのはテストエンジンとPDF:https://www.goshiken.com/SAP/C_TS4CO_2021-mondaishu.html
お手軽に合格させる最新のSAP C_TS4CO_2021問題集には82問があります:https://drive.google.com/open?id=1B05SPgSZcH-saVSKZ8N_SaMJazgs5IHi