最新 [2022年03月13日] 100%合格率を保証します素晴らしいC-IBP-2111試験問題PDF
C-IBP-2111認定有効な試験問題集解答で学習ガイド!(最新の82問題)
質問 21
You are using the Resource Location master data type. How do you specify capacity supply as time- dependent?
- A. Maintain the CAPASUPPLY key figure values in the planning area.
- B. Set the Capacity Supply Time Series indicator in the Resource Location master data type.
- C. Set the Capacity Supply Time Series indicator attribute as a key.
- D. Set the Capacity Supply additional attribute in the time profile.
正解: B
質問 22
Which of the following key functions are supported by SAP IBP for sales and operations? Note: There are
2 correct Answers to this question.
- A. Manual creation of feasible constrained plans
- B. An advanced demand planning process
- C. A basic demand planning process
- D. Finite resource planning
正解: C,D
質問 23
What are the ways to achieve rolling aggregation with SAP IBP?
- A. Using local member
- B. Using attribute as a key figure
- C. Using key figure calculation
- D. Using aggregation mode average
正解: D
質問 24
Which of the following conditions are relevant for subtotals in the planning view? Note: There are 2 correct Answers to this question.
- A. The total number of attributes that can use subtotals in the planning view can be restricted.
- B. Only attribute-based totals can be added to the planning view.
- C. The values of the attribute-based total at the highest attribute level in the planning level can be changed.
- D. The total value can be added before or after the selected attribute.
正解: A,D
質問 25
You are modeling the introduction of a new product using Lifecycle Planning functionality in SAP IBP.
What is mandatory to create in your planning area for the setup of reference product(s) to work? Note:
There are 2 correct Answers to this question.
- A. Planning objects for the new product
- B. Definition of an attribute representing the product ID
- C. Definition of an attribute representing the product description
- D. Definition of Actual Sales business meaning for one key figure
正解: A,B
質問 26
Which of the following can be used as inputs for inventory level optimization? Note: There are 2 correct Answers to this question.
- A. Lead time variability
- B. Lot sizes
- C. Reorder point
- D. Target inventory level
正解: A,B
質問 27
You are redesigning planning for supply chain that is facing the issue of variability. What is the best solution for dampening variability via demand classification?
- A. SAP IBP for Demand
- B. SAP IBP for Inventory
- C. SAP IBP for Demand Driven Replenishment
- D. SAP IBP for Sales and Operations Planning
正解: C
質問 28
NO.53 Which calculations can be processed within the pre-processing step in the forecasting model? Note:
There are 2 correct Answers to this question.
- A. Rounding can be executed for the sales history.
- B. Missing Values can be substituted.
- C. Correlations can be evaluated.
- D. Promotion Sales Lift Ups can be deleted.
正解: B,D
質問 29
You want to display and edit data in different units of measure (UOM). Which of the following must you consider before you use UOM? Note: There are 3 correct Answers to this question.
- A. Unit of measure is an attribute of a master data type, such as Product.
- B. Units of measure are usually not time-independent.
- C. Conversion to the target unit of measure is handled by functionality of SAP IBP Excel UI
- D. Units of measure are usually not time-dependent.
- E. Analytics provide the user with the option to select the target unit of measure.
正解: A,D,E
質問 30
Which of the following stages can be modeled using scenarios from the S&OP planning cycle? Note:
There are 2 correct Answers to this question.
- A. Data input review for inventory
- B. Demand-supply balancing
- C. Demand sensing stage
- D. Demand review
正解: B,D
質問 31
You are working to realign the data due to a recent warehouse closure. What should you be aware of in regards to configuration of realignment steps? Note: There are 2 correct Answers to this question.
- A. If a realignment step fails, subsequent steps are not processed.
- B. The name of the realignment step should be no longer than 20 characters.
- C. The number of steps in realignment run is limited to 255.
- D. The realignment step status must be set to In Review for it to be executed.
正解: A,D
質問 32
Analytics charts are created by the user in the Advanced Analytics application. What actions are possible in the Advanced Analytics app? Note: There are 2 correct Answers to this question.
- A. Group data.
- B. Apply filters on your data.
- C. Merge charts together.
- D. Open graphics in Excel.
正解: A,B
質問 33
The Analytics Advanced app allows you to work with different types of charts. What can be the origin of the charts you can work with?
- A. SAP IBP VBA Add-in template
- B. Process Templates
- C. Dashboards Advanced
- D. Custom Alerts
正解: A
質問 34
Which of the following key functions are supported by SAP IBP for sales and operations? Note: There are 2 correct Answers to this question.
- A. Manual creation of feasible constrained plans
- B. An advanced demand planning process
- C. A basic demand planning process
- D. Finite resource planning
正解: C,D
質問 35
Which library is used by the forecasting engine for the demand sensing algorithm?
- A. Predictive analytics library
- B. Heuristics library
- C. Demand library
- D. Supply chain algorithm library
正解: D
質問 36
......
C-IBP-2111時間限定!無料アクセス:https://www.goshiken.com/SAP/C-IBP-2111-mondaishu.html