
C-IBP-2111問題集最新版を今すぐ試そう![2022年01月] 試験準備には欠かせません!
有能な受験者がシミュレーション済みのC-IBP-2111試験PDF問題を試そう
質問 44
Which SAP IBP planning operator can be run to delete planning objects in a certain version?
- A. Purge Master Data
- B. Purge Key Figure Data Outside Planning Area Planning Horizon
- C. Purge Key Figure Data
- D. Purge Non-Confirming Data
正解: C
質問 45
You need to create time periods for the time profile in a planning area. What should you be aware of when executing the Create Time Periods application job?
- A. The planning area with this time profile must be activated so that the application job can proceed.
- B. This application job cannot be scheduled for immediate start.
- C. This application job can be run for multiple time profiles at once.
- D. A time profile has to be activated so that the application job can proceed.
正解: A
質問 46
You created a key figure and want to add calculations. Which of the following rules do you consider?
Note: There are 2 correct Answers to this question.
- A. Key figures can be calculated across different planning levels.
- B. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation level.
- C. All key figure calculations have calculation inputs, which can be marked as stored or calculated.
- D. The calculation chain for a key figure must always result in a calculated key figure.
正解: A,C
質問 47
Which of the following modes can you use when creating a constrained plan? Note: There are 2 correct Answers to this question.
- A. Profit maximization
- B. Production maximization
- C. Delivery maximization
- D. Resource maximization
正解: A,C
質問 48
NO.53 Which calculations can be processed within the pre-processing step in the forecasting model? Note:
There are 2 correct Answers to this question.
- A. Rounding can be executed for the sales history.
- B. Missing Values can be substituted.
- C. Correlations can be evaluated.
- D. Promotion Sales Lift Ups can be deleted.
正解: B,D
質問 49
A time profile is defined with the levels of day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other buckets?
- A. IF("PERIODID5" ="$$PERIODID5CU$$...)
- B. IF("PERIODID4" = "SSPERIODID4CU$$...)
- C. IF("PERIODID2" ="$$PERIODID2CU$$...)
- D. IF("PERIODID3" ="$$PERIODID3CUSS...)
正解: B
質問 50
How can you make charts and dashboards private?
- A. Enable the relevant settings in the Analytics Advanced and Dashboards Advanced applications.
- B. Choose only relevant key figures and filters in the Analytics Advanced application.
- C. Set restrictions for charts in the Permission filter application.
- D. Enable the relevant settings in the global configuration parameters.
正解: D
質問 51
SAP is transitioning IBP customers to the new process of export/import. What are some of the features of this new process? Note: There are 2 correct Answers to this question.
- A. You can export from a planning area that is on a different release.
- B. You can choose to import only some of the items that were exported.
- C. You can move a transported item from one collection to another.
- D. You can create a collection of items and export it.
正解: A,C
質問 52
Which of the following solutions are feasible when using the time series supply optimizer? Note: There are 3 correct Answers to this question.
- A. Not-fully satisfied demands
- B. Violation of minimum resource utilization
- C. Violation of minimum aggregated inventory values
- D. Not respecting production capacity
- E. Not adhering to maximum transport values
正解: A,B,C
質問 53
You want to display and edit data in different units of measure (UOM). Which of the following must you consider before you use UOM? Note: There are 3 correct Answers to this question.
- A. Unit of measure is an attribute of a master data type, such as Product.
- B. Units of measure are usually not time-independent.
- C. Conversion to the target unit of measure is handled by functionality of SAP IBP Excel UI
- D. Units of measure are usually not time-dependent.
- E. Analytics provide the user with the option to select the target unit of measure.
正解: A,D,E
質問 54
Which header name displays are available in the Report Options menu of the SAP IBP Excel interface?Note:
There are 2 correct Answers to this question.
- A. Business meaning, as defined in configuration
- B. Full unique name including the dimension and technical name
- C. Caption, as defined in configuration for the default name
- D. Changed member names that the user had created
正解: A,B
質問 55
Which header name displays are available in the Report Options menu of the SAP IBP Excel interface?
Note: There are 2 correct Answers to this question.
- A. Business meaning, as defined in configuration
- B. Full unique name including the dimension and technical name
- C. Caption, as defined in configuration for the default name
- D. Changed member names that the user had created
正解: A,B
質問 56
You are reviewing the master data types for supply planning. Which master data types are compound master data types? Note: There are 2 correct Answers to this question.
- A. SOURCECUSTOMER
- B. LOCATIONFR
- C. SOURCELOCATION
- D. SOURCEPRODUCTION
正解: A,C
質問 57
You are creating advanced copy operators as part of an SAP IBP solution that is being implemented.
What do you need to be aware of when defining data transfer? Note: There are 2 correct Answers to this question.
- A. Selecting by attribute with option 'contain' is possible.
- B. Specifying target key figure that is time independent is possible.
- C. Specifying target key figure is mandatory.
- D. Specifying source key figure is mandatory.
正解: C,D
質問 58
You want to set up demand sensing to analyze demand changes in execution or close to execution windows. Which of the following conditions must you consider during the setup? Note: There are 2 correct Answers to this question.
- A. The result generates sensed demand data at the monthly time granularity for the full time horizon.
- B. It is mandatory to load historical lag-based snapshot data.
- C. Set up the forecast model to be executed at product-location level.
- D. At setup test the system to run the demand sensing (full) algorithm weekly and the demand sensing (update) on a daily basis.
正解: B,D
質問 59
What is a prerequisite for modeling outsourced manufacturers with production capacity?
- A. Model target inventory and stocks at the outsourced location.
- B. Model production costs for internal and external production resources to model priority.
- C. Ensure that multiple modes of transportation are set up.
- D. Use production lead times and offsets to manage components at the outsourced location.
正解: B
質問 60
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing. Which of the following parameters can you model to plan production with extra shift(s)?
- A. Capacity expansion with additional costs
- B. Adjusted production interactive values
- C. Production source validity at the start of seasonal peak
- D. Incremental production values
正解: A
質問 61
You have set up a planning area and data is available. You adjust the necessary time profile settings and run the consistency check. Which settings can you change and still run a successful consistency check? Note:
There are 2 correct Answers to this question.
- A. Change the description of the attributes in the time profile.
- B. Add a new time profile level to the time profile.
- C. Remove an attribute assigned to the time profile level if the attribute is used in a planning level.
- D. Change the past and future horizon of the levels in the time profile.
正解: A,D
質問 62
......
検証済み材料を使うならまずC-IBP-2111テストエンジンを試そう:https://www.goshiken.com/SAP/C-IBP-2111-mondaishu.html