質問 # 39
Match each component of the VxRail HCI System Software to its description.
正解:
解説:
質問 # 40
What is a consideration when performing a VxRail software upgrade from version 4.7.xxx to version 7.0.xxx?
- A. VxRail Manager VM must be changed to the default name to avoid an upgrade failure
- B. vCenter Server requires a temporary IP address on a different subnet before the upgrade
- C. External vCenter server must be upgraded after the VxRail is upgraded
- D. Secure boot must be enabled on the ESXi hosts for a successful upgrade
正解:C
質問 # 41
A VxRail Manager VM must be configured as follows:
* IP address: 192 168.10.16
* Net mask: 255.255.255.0
* Gateway: 192 168 10 254
Which command must be used?
- A. vxrail-primary -config --vxrail-address 192.168.10 16 --vxrail-netmask 255 255 255 0 -vxrail-gateway
192.168,10 254 - B. vxrail-network-config --ip 192 168 10.16-netmask 255.255.255.0-gateway 192 168 10.254
- C. vxrail-network -config --vxrail-address 192.166 10 16 --vxrail-netmask 255 255.255 0 --vxrail-gateway
192.168.10.254 - D. vxrail-prrmary -config --ip 192 168 10 16 -netmask 255 255 255 0 -gateway 192 168 10 254
正解:A
質問 # 42
A systems engineer needs to ensure that the VxRail system is healthy and any issues found are addressed prior to starting an upgrade process. Where in the vSphere Client can they review alarms and overall vSAN health?
- A. Monitor > Issues and Alarms > All issues
Monitor > vSAN > Skyline Health - B. Triggered Alarms > All Issues > Issues and Alarms
Triggered Alarms > vSAN > Health - C. Monitor > All Issues > Issues and Alarms
Monitor > vSAN > Health - D. Triggered Alarms > Issues and Alarms > All issues
Triggered Alarams > vSAN > Skyline Health
正解:C
質問 # 43
Match each component of the VxRail HCI System Software to its description.
正解:
解説:
質問 # 44
A 2-node VxRail duster Is being deployed. Due to a preparation mistake, the host section fe missing. Use the VxRail simulator to fully deploy the cluster using the JSON file.
Node Names:
vcluster-esxO 15-vrack
vcluster-esxO 16-vrack
Starting IP
Address: 192.168.10.15
Rack Name: Virtual Rack
Rack Position: 15-16
Passwords: Passwordl23
!
ESXI Management
User: esxmgmt
When you have finished, continue to the next question.




- A. Send your suggestions for this question.
正解:A
質問 # 45
From what location should NVT for VxRail be run?
- A. Laptop connected to the first VxRail ESXi node
- B. VxRail network Top of Rack switch
- C. Workstation on the same network as VxRail Manager
- D. Jump server on a different network
正解:C
質問 # 46
A systems engineer is deploying a VxRail cluster. They want to ensure that configuration issues can be avoided when expanding this cluster.
Which actions need to be performed?
- A. Validate that no pending and unfinished jobs are running on the servers Verify that the server and storage components are working properly
- B. Verify VxRail nodes are racked and connected to the ToR switches
Validate the network environment - C. Validate that the latest updates and patches are installed in the system Validate that no pending and unfinished jobs are running on the servers
- D. Verify the configuration settings initially captured in PEQ
Validate the storage environment
正解:C
質問 # 47
An implementation engineer is expanding an existing VxRail E Series cluster with an additional node The version of the node is not at the current cluster level and is not compatible What action must be performed before adding the node?
- A. Order node with correct image
- B. RASR Factory Image Upgrade
- C. Compute node expansion
- D. RASR Factory Reset
正解:A
質問 # 48
Match each VxRail, data protection solution with its functionality.
正解:
解説:
質問 # 49
Match each component of the VxRail HCI System Software to its description.
正解:
解説:
質問 # 50
An implementation engineer is expanding an existing VxRail S Series cluster with an additional node. The version of the node is not at the current cluster level but is compatible.
What procedure would result in the quickest node addition?
- A. RASR Factory Image Upgrade
- B. VxRail Node Imaging Management
- C. Compute node expansion
- D. Factory Reset
正解:A
質問 # 51
What data protection option is included with VxRail?
- A. RecoverPoint for VM Avamar
- B. vSphere Replication NetWorker
- C. PowerProtect Software Data Domain Cloud Tier
- D. RecoverPoint for VM vSphere Replication
正解:D
質問 # 52
An implementation engineer logs in to the vSphere Client of a recently deployed VxRail cluster. They want to review the firmware versions on the VxRail nodes.
Which view should they use to gather this information?
- A. Hosts and Clusters > VxRail Cluster > Monitor > VxRail > Appliances
- B. Hosts and Clusters > VxRail Cluster > Configure > VxRail > System
- C. Hosts and Clusters > VxRail Host > Configure > VxRail > iDRAC Configuration
- D. Host and Clusters > VxRail Host > Monitor > VxRail > Physical View
正解:C
質問 # 53
What must be used when deploying VxRail with a customer-supplied VDS?
- A. VxRail API with configuration file
- B. Deployment Wizard using the configuration file method
- C. VxRail PowerShell SysBringUp Module
- D. Deployment Wizard using the step-by-step method
正解:D
質問 # 54
An implementation engineer is in the validation phase of a VxRail deployment with two Dell EMC ToR switches. Which command should they run on each of the ToR switches to validate that Link Aggregation has been configured according to Dell best practices for VxRail node interfaces?
- A. show interface
- B. show interface status
- C. show network-policy profile
- D. show port-channel summary
正解:D
質問 # 55
What is the minimum number of VxRail nodes required for a vSAN storage policy with RAID-6 (Erasure Coding)?
- A. 0
- B. 1
- C. 2
- D. 3
正解:D
質問 # 56
After implementation, the implementation engineer observes errors from both VxRail Manager and vCenter Server. Dell EMC support has requested a log bundle containing only the required log files. Using the simulator, create and download a log bundle for Dell EMC support.
When you have finished, continue to the next question.





正解:
解説:
Pending
Send your suggestions for this question.
質問 # 57
Which requirement must be met when expanding a 3-node VxRail G560F cluster with a fourth G Series node in the same chassis?
- A. New node must be at the same VxRail version as existing nodes
- B. PCIe network card must be added to all nodes
- C. Node hardware must be identical to the other three nodes
- D. Node requires only the same drive configuration
正解:D
質問 # 58
......
EMC DES-6322の試験に合格すると、候補者はVxRail実装エンジニアの認定専門家として認められます。この認定は、個人がVxRailシステムを効果的に実装および管理するために必要なスキルと知識を持っていることを雇用主や顧客に示すものです。