C_TS422_2021試験問題集を使って一日でSAP Certified Application Associate試験合格目指す(最新の82解答) [Q41-Q62]

Share

C_TS422_2021試験問題集を使って一日でSAP Certified Application Associate試験合格目指す(最新の82解答)

C_TS422_2021試験正確な問題集、学習ノートと理論

質問 # 41
Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?

  • A. Assign the overall profile to the authorization profile.
  • B. Create object selection variant for product-related alerts.
  • C. Assign the alert profile to the overall profile.
  • D. Create object selection variant for transportation lane-related alerts.

正解:B、C


質問 # 42
Which of the following questions do you have to answer before you start creating a BOM?

  • A. In which storage location is the BOM required?
  • B. Is the material type allowed in the BOM?
  • C. Which Valid To information is necessary?
  • D. What status does the BOM have?

正解:B、C


質問 # 43
For what production type are production orders used?

  • A. Process manufacturing processes
  • B. Period and quantity-oriented production
  • C. Discrete manufacturing processes
  • D. Replenishment controlled by control cycles

正解:C


質問 # 44
Which SAP application can be used for forcasting in Supply Chain Planning?

  • A. Material Requirements Planning (MRP)
  • B. Capacity Requirements Planning (CRP)
  • C. Supply Chain Management(SCM)
  • D. Integrated Business Planning (IBP)

正解:C、D


質問 # 45
You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?

  • A. When you create a planned order
  • B. When you deliver a sales order
  • C. When you create a sales order
  • D. When the MRP result are saved

正解:C


質問 # 46
What is the difference between co-products and by-products?

  • A. Only by-products have a zero inventory valuation.
  • B. Only co-products are identified by a special item category in the bill of material (BOM).
  • C. Only co-products can be manufactured in isolation from the main product.
  • D. Only co-products appear in the process or production order settlement rule.

正解:D


質問 # 47
How can you carry out cost object controlling for production orders?

  • A. Product-related
  • B. Order-related
  • C. Cost-related
  • D. Milestone-related

正解:A、B


質問 # 48
You set up a material as a phantom assembly by entering the special procurement key in the material master.
How can you switch off the phantom assembly in a specific bill of material (BOM)?

  • A. Change the explosion type of the phantom assembly in the BOM.
  • B. Change the item category of the phantom assembly in the BOM.
  • C. Change the phantom item indicator for the phantom assembly in the BOM.
  • D. Change the special procurement key of the phantom assembly in the BOM.

正解:A


質問 # 49
You use planning strategy Finite Scheduling - with Reverse adn want to allow scheduling in the past. How can you achive this?

  • A. Specify a negative offset time in the strategy profile.
  • B. Specify a negative lanning horizon in the strategy profile.
  • C. Specify a positive offset time in the strategy profile.
  • D. Specify a positive planning horizon in the strategy profile.

正解:A


質問 # 50
When can the automatic material availability check occur in a production order?

  • A. At order settlement
  • B. At order release
  • C. At order creation
  • D. At order confirmation

正解:B、C


質問 # 51
Which materials have a negative quantity in a bill of materials or in a recipe?

  • A. Waste products
  • B. Continuous flow materials
  • C. Bulk materials
  • D. Co-products
  • E. By-products

正解:B、D、E


質問 # 52
Where do you maintain the work center that represents the production line for repetitive manufacturing?

  • A. Production version
  • B. Repetitive manufacturing profile
  • C. Production cost collector
  • D. Routing

正解:A、D


質問 # 53
In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.

  • A. Finiteness level
  • B. Planning mode
  • C. Fixed pegging
  • D. Scheduling control
  • E. Direction

正解:B、D、E


質問 # 54
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
  • B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
  • C. MRP creates capacity requirements only if the work center has sufficient capacity.
  • D. MRP creates capacity requirements without checking the capacity of a work center.

正解:D


質問 # 55
You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched. How does the insertion take place?

  • A. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
  • B. The previously dispatched operation stays as is; the new operation is inserted after the the dispatched operation.
  • C. The previously dispatched operation stays as is; the new operation is inserted before the the dispatched operation.
  • D. The new operation is inserted at the desired time; the previously dispatched operation is moved backward.

正解:D


質問 # 56
Which business processes are affected by setting in the order type-dependent parameters?

  • A. Select master data.
  • B. Intiate quality inspections.
  • C. Define integration to cost accounting.
  • D. Implement engineering changes.

正解:A、C


質問 # 57
Which of the following elements does MRP take into account during net requirement calculation?

  • A. Purchase orders
  • B. Safety stock
  • C. Lot size
  • D. Maximum stock level

正解:B、C


質問 # 58
What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing?

  • A. Alternative work centers are fully occupied.
  • B. The finite Scheduling indicator is NOT set in the strategy profile.
  • C. The work center has several invidula capacities.
  • D. The Change Planning Direction indicator is set in strategy profile.

正解:B、C


質問 # 59
Which mhetods are available for goods issue posting of material components for process orders?

  • A. Blackflushing
  • B. Transfer order
  • C. Kanban
  • D. Picking list

正解:A、D


質問 # 60
Which item statuses can you select inside a material BOM?

  • A. Service
  • B. Quality management
  • C. Engineering
  • D. Sales

正解:C、D


質問 # 61
Which times elements does MRP consider in backward scheduling to determine he order dates for components from dependent requirements?

  • A. In-house production time
  • B. Planed delivery time
  • C. Operation duration
  • D. Total replenishment lead time

正解:A、B


質問 # 62
......