
C_TS422_2021試験問題集を使って一日でSAP Certified Application Associate試験合格目指す(最新の82解答)
C_TS422_2021試験正確な問題集、学習ノートと理論
質問 # 41
Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?
- A. Assign the overall profile to the authorization profile.
- B. Create object selection variant for product-related alerts.
- C. Assign the alert profile to the overall profile.
- D. Create object selection variant for transportation lane-related alerts.
正解:B、C
質問 # 42
Which of the following questions do you have to answer before you start creating a BOM?
- A. In which storage location is the BOM required?
- B. Is the material type allowed in the BOM?
- C. Which Valid To information is necessary?
- D. What status does the BOM have?
正解:B、C
質問 # 43
For what production type are production orders used?
- A. Process manufacturing processes
- B. Period and quantity-oriented production
- C. Discrete manufacturing processes
- D. Replenishment controlled by control cycles
正解:C
質問 # 44
Which SAP application can be used for forcasting in Supply Chain Planning?
- A. Material Requirements Planning (MRP)
- B. Capacity Requirements Planning (CRP)
- C. Supply Chain Management(SCM)
- D. Integrated Business Planning (IBP)
正解:C、D
質問 # 45
You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?
- A. When you create a planned order
- B. When you deliver a sales order
- C. When you create a sales order
- D. When the MRP result are saved
正解:C
質問 # 46
What is the difference between co-products and by-products?
- A. Only by-products have a zero inventory valuation.
- B. Only co-products are identified by a special item category in the bill of material (BOM).
- C. Only co-products can be manufactured in isolation from the main product.
- D. Only co-products appear in the process or production order settlement rule.
正解:D
質問 # 47
How can you carry out cost object controlling for production orders?
- A. Product-related
- B. Order-related
- C. Cost-related
- D. Milestone-related
正解:A、B
質問 # 48
You set up a material as a phantom assembly by entering the special procurement key in the material master.
How can you switch off the phantom assembly in a specific bill of material (BOM)?
- A. Change the explosion type of the phantom assembly in the BOM.
- B. Change the item category of the phantom assembly in the BOM.
- C. Change the phantom item indicator for the phantom assembly in the BOM.
- D. Change the special procurement key of the phantom assembly in the BOM.
正解:A
質問 # 49
You use planning strategy Finite Scheduling - with Reverse adn want to allow scheduling in the past. How can you achive this?
- A. Specify a negative offset time in the strategy profile.
- B. Specify a negative lanning horizon in the strategy profile.
- C. Specify a positive offset time in the strategy profile.
- D. Specify a positive planning horizon in the strategy profile.
正解:A
質問 # 50
When can the automatic material availability check occur in a production order?
- A. At order settlement
- B. At order release
- C. At order creation
- D. At order confirmation
正解:B、C
質問 # 51
Which materials have a negative quantity in a bill of materials or in a recipe?
- A. Waste products
- B. Continuous flow materials
- C. Bulk materials
- D. Co-products
- E. By-products
正解:B、D、E
質問 # 52
Where do you maintain the work center that represents the production line for repetitive manufacturing?
- A. Production version
- B. Repetitive manufacturing profile
- C. Production cost collector
- D. Routing
正解:A、D
質問 # 53
In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.
- A. Finiteness level
- B. Planning mode
- C. Fixed pegging
- D. Scheduling control
- E. Direction
正解:B、D、E
質問 # 54
What does it mean for the production planner when MRP works with infinite capacities?
- A. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
- B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
- C. MRP creates capacity requirements only if the work center has sufficient capacity.
- D. MRP creates capacity requirements without checking the capacity of a work center.
正解:D
質問 # 55
You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched. How does the insertion take place?
- A. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
- B. The previously dispatched operation stays as is; the new operation is inserted after the the dispatched operation.
- C. The previously dispatched operation stays as is; the new operation is inserted before the the dispatched operation.
- D. The new operation is inserted at the desired time; the previously dispatched operation is moved backward.
正解:D
質問 # 56
Which business processes are affected by setting in the order type-dependent parameters?
- A. Select master data.
- B. Intiate quality inspections.
- C. Define integration to cost accounting.
- D. Implement engineering changes.
正解:A、C
質問 # 57
Which of the following elements does MRP take into account during net requirement calculation?
- A. Purchase orders
- B. Safety stock
- C. Lot size
- D. Maximum stock level
正解:B、C
質問 # 58
What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing?
- A. Alternative work centers are fully occupied.
- B. The finite Scheduling indicator is NOT set in the strategy profile.
- C. The work center has several invidula capacities.
- D. The Change Planning Direction indicator is set in strategy profile.
正解:B、C
質問 # 59
Which mhetods are available for goods issue posting of material components for process orders?
- A. Blackflushing
- B. Transfer order
- C. Kanban
- D. Picking list
正解:A、D
質問 # 60
Which item statuses can you select inside a material BOM?
- A. Service
- B. Quality management
- C. Engineering
- D. Sales
正解:C、D
質問 # 61
Which times elements does MRP consider in backward scheduling to determine he order dates for components from dependent requirements?
- A. In-house production time
- B. Planed delivery time
- C. Operation duration
- D. Total replenishment lead time
正解:A、B
質問 # 62
......
C_TS422_2021問題集PDFで最速合格希望C_TS422_2021:https://www.goshiken.com/SAP/C_TS422_2021-mondaishu.html
100% 高得点合格保証C_TS422_2021無制限82解答:https://drive.google.com/open?id=1bipkUToKyHRbxQdBG82pxNkrQUfiyeUG