
[2023年11月] 無料C_IBP_2302試験問題集試験点数を伸ばそう
2023年最新のC_IBP_2302実際問題集には試験のコツがあるPDF試験材料
SAP C_IBP_2302試験に登場する候補者は、SAP IBPの操作の経験とともに、サプライチェーン管理業界の基本的な知識を持っている必要があります。認定試験では、80の複数選択の質問で構成されており、その期間は180分です。この試験では、サプライチェーン計画のためにSAP IBPアプリケーションを実装、操作、構成する候補者の能力を測定します。
質問 # 46
Which of the following are examples of time-independent key figures?Note: There are 2 correct answers to this question.
- A. A forecast metric key figure, such FCSTMAPE
- B. A unit of measure key figure, such as UOMCONVERSIONFACTOR
- C. A currency conversion key figure, such as exchange rate
- D. A special key figure marked as an aggregate key figure (aggregate constraint)
正解:B、D
質問 # 47
Using the import/export functionality means working with groups of items that are organized into collections.What is the best practice for managing collections?
- A. A planning area with its time profile must be bundled in one collection.
- B. A planning area with the copy operators assigned must be bundled in one collection.
- C. Configuration items should be bundled in the collections based on the SAP IBP project stream.
- D. You should delete collections after they have been transported.
正解:A、B
質問 # 48
SAP IBP ensures interoperability with which applications?Note: There are 2 correct answers to this question.
- A. Financial Planning in SAP Analytics Cloud
- B. User management in SAP Success Factors
- C. Business Network in SAP Ariba
- D. Salesforce Sales Cloud
正解:A、C
質問 # 49
You need to define a new logic for a key figure to drive values from the PERPRODCUSTREGION level to the PERPRODCUST level.Which of the following configuration options are possible for this process?Note: There are 2 correct answers to this question.
- A. Splitting the values from detailed to aggregated level by using a copy operator
- B. Splitting the values from aggregated to detailed level, based on the time profile attribute
- C. Splitting the values from aggregated to detailed level, based on a stored split-factor key figure
- D. Splitting the values from aggregated to detailed level using multiplication by the proportions
正解:C、D
質問 # 50
What does ABC/XYZ segmentation allow you to do?Note: There are 2 correct answers to this question.
- A. Use forecasting algorithms that are specific to seasonal demands of SKUs in the segment "B".
- B. Substitute missing values in case of sporadic demands.
- C. Choose time-independent key figures as segmentation measures.
- D. Identify inventory items that require closer attention.
正解:C、D
質問 # 51
Which of the following are valid use cases for using the Realignment App?Note: There are 2 correct answers to this question.
- A. Merging two locations into a new location
- B. Changing customer sources and reassigning customers to new DCs
- C. Removing outliers from the sales history of a reference product before transferring its sales to a new product
- D. Using the realignment run to identify obsolete data
正解:A、B
質問 # 52
You want to maintain key figure values for a new attribute and value combination, using SAP IBP, Add-in for Microsoft Excel, and are receiving an error related to missing combinations.How can you resolve this problem?Note: There are 2 correct answers to this question.
- A. Use the Check Mode operator to create the combinations
- B. Use the Data Integration app to load suitable data that creates the combinations
- C. Use the option New Planning Object in the SAP IBP, add-in for Microsoft Excel
- D. Use the Manage Master Data app to create the combinations
正解:B、D
質問 # 53
Which of the following are capabilities of the Manage Forecast Error Calculations - Inventory Optimization app?Note: There are 2 correct answers to this question.
- A. Adjust for forecast bias in Forecast Error CV calculations
- B. Adjust Safety Stock Recommendations based on forecast error CV input
- C. Identifiy intermittent demand for Forecast Error CV calculations
- D. Propagate forecast error to upstream locations in a supply chain network
正解:A、B
質問 # 54
You are working to realign the data due to a recent warehouse closure.What should you be aware of in regards to the realignment steps settings?Note: There are 2 correct answers to this question.
- A. You must mark the realignment step as "shared" and assign the steps to users.
- B. The number of steps in the realignment run is limited to 255.
- C. A realignment step can change master data, planning objects and key figures.
- D. The name of the realignment step should be no longer than 20 characters.
正解:A、C
質問 # 55
How many different time levels can be selected within one planning view?
- A. Only time levels from the base planning level of selected key figures
- B. All time levels available in the time profile
- C. Only base time levels of the planning area
- D. All time levels available in the time profile, restricted by global configuration parameter
正解:B
質問 # 56
You need to integrate data from SAP S/4HANA and legacy ERP to SAP IBP.What are the integration tools that you can use with such a setup for data transfer?Note: There are 2 correct answers to this question.
- A. Smart Data Integration
- B. Cloud Identity Authentication Service
- C. Real-time Integration
- D. Cloud Integration for Data Services
正解:A、D
質問 # 57
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.
- A. Transportation lead times
- B. Aggregated constraints
- C. Minimum lot size
- D. Adjusted transport receipts
- E. Maximum lot size
正解:A、D、E
質問 # 58
What are the S&OP operator (optimizer) parameters associated with demand fair share?
- A. Number of fair share segments Additional tiering costs (default) Maximum inventory
- B. Number of fair share segments Additional tiering costs (default) Number of fair share segments late delivery
- C. Number of fair share segments Maximum days of coverage Number of fair share segments late delivery
- D. Number of fair share segments Additional tiering costs (default) Inventory days of supply
正解:B
質問 # 59
Which type of Master Data will be represented by the Master Data Type LOCATIONFR?
- A. Compound Master Data Type
- B. Reference Master Data Type
- C. External Master Data Type
- D. Virtual Master Data Type
正解:B
質問 # 60
Which of the following data inputs, when increased, will always cause an increase in the safety stock outputs when the Global (multi-stage) Inventory Optimization operator is run?Note: There are 2 correct answers to this question.
- A. Transportation Lead Time Error CV
- B. Holding Cost Percentage
- C. Target Service Level
- D. Minimum Lot Size
正解:C、D
質問 # 61
Safety Stock outputs from Multistage Inventory Optimization are sent to which of these processes? Note: There are 2 correct answers to this question.
- A. Demand Sensing with Gradient Boosting (Full)
- B. Decoupling Points determination in SAP IBP for demand-driven replenishment
- C. Supply Heuristics in SAP IBP for sales and operations
- D. Charts creation in SAP Supply Chain Control Tower
正解:A、C
質問 # 62
You are working with inventory key figures.What are some of the business scenarios where you can use the Last Period Aggregation function?Note: There are 2 correct answers to this question.
- A. Calculating how many periods inventory is going to last based on the planned demand
- B. Search for and return the last not null value of the inventory key figure
- C. Calculating the value of inventory on any time profile level ensuring flexibility of calculation
- D. Calculating the value of inventory on a weekly basis, using static aggregation from the daily level
正解:A、B
質問 # 63
What are some of the properties of filter blocks?Note: There are 3 correct answers to this question.
- A. Filter blocks can be visualized in SAP IBP, add-in for Microsoft Excel
- B. Filter blocks can be visualized in the Key Figure Calculations app.
- C. Filter blocks are imposed when modeling cross-period calculations.
- D. Filter blocks are imposed when modeling attribute transformations.
- E. Filter blocks are imposed when modeling an attribute as a key figure.
正解:A、D、E
質問 # 64
You want to display and edit data in different Units of Measure (UOM).Which of the following must you consider before you use the UOM?Note: There are 3 correct answers to this question.
- A. Unit of measure is an attribute of a master data type, such as Product.
- B. Units of measure are usually not time-dependent.
- C. Analytics provide the user with the option to select the target unit of measure.
- D. Conversion to the target unit of measure is handled by SAP IBP Excel UI
- E. Units of measure are usually not time-independent.
正解:A、B、C
質問 # 65
Which of the following are features of the S&OP process templates?Note: There are 2 correct answers to this question.
- A. New instances of templates allow for re-use of the same processes.
- B. The S&OP process step can be started with an application job.
- C. All process templates are assigned to dashboards.
- D. Each step depicted in the template can have tasks associated with it.
正解:A、D
質問 # 66
You create a planning filter using an SAP IBP Fiori app.Which of the following objects can it be applied to?Note: There are 2 correct answers to this question.
- A. Snapshot operator in the SAP IBP add-in for Microsoft Excel
- B. Planning view templates in the SAP IBP add-in for Microsoft Excel
- C. Jobs in the Applications Jobs app
- D. Supply chain graph in Supply Chain Network app
正解:B、C
質問 # 67
Which of the following data can be tracked using a change-history-enabled key figure?Note: There are 3 correct answers to this question.
- A. Modified date
- B. Scenario ID
- C. Attributes
- D. Reason code
- E. Key figure type
正解:A、C、D
質問 # 68
You set up time-series integration using Cloud Integration for Data Services. During the integration process of master data, an error occurred. In the Data Integration app the job failed with status "Fatal Error". How can you find more details about the error?
- A. Navigate to the Master Data Workbook in Excel and open the Log.
- B. Download the Initial Problem Report in the Data Integration app.
- C. Download the Rejection Report in the Data Integration app.
- D. Navigate to the Manage Master Data app and open the Log.
正解:D
質問 # 69
......
認定は、SAPコンサルタント、プロジェクトマネージャー、またはIBP実装リーダーになりたい個人に最適です。この試験は、候補者がSAP IBPソリューションとその複数のモジュールにわたる機能の理解をテストします。これには、需要、在庫、応答、および供給計画が含まれます。
SAP C-IBP-2302の認定取得は、サプライチェーンマネジメントの分野でキャリアを進めたい専門家にとって、貴重な資格です。この認定試験に合格することで、SAP IBP for Supply Chainに関する専門知識を証明することができ、SAP IBP for Supply Chainソリューションを効果的に実装および管理できる熟練した専門家を特定することができます。また、この認定試験は、専門家が最新のSAP技術やサプライチェーンマネジメントのトレンドについて常に最新情報を持つことができる素晴らしい方法でもあります。
心強いC_IBP_2302のPDF問題集はC_IBP_2302問題:https://www.goshiken.com/SAP/C_IBP_2302-mondaishu.html
正真正銘のC_IBP_2302問題集で無料PDF問題で合格させる:https://drive.google.com/open?id=1cr2Frp3EP91vVjVQdeiorexbvEEGZyc3