
C_IBP_2302無料更新100%試験合格率保証 [2023]
[2023年11月] 認証されたSAP試験問題集でC_IBP_2302試験学習ガイド
質問 # 38
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.
- A. Maximum lot size
- B. Minimum lot size
- C. Aggregated constraints
- D. Transportation lead times
- E. Adjusted transport receipts
正解:A、D、E
質問 # 39
Which type of Master Data will be represented by the Master Data Type LOCATIONFR?
- A. External Master Data Type
- B. Reference Master Data Type
- C. Compound Master Data Type
- D. Virtual Master Data Type
正解:B
質問 # 40
How many different time levels can be selected within one planning view?
- A. All time levels available in the time profile, restricted by global configuration parameter
- B. All time levels available in the time profile
- C. Only base time levels of the planning area
- D. Only time levels from the base planning level of selected key figures
正解:B
質問 # 41
Which applications are present in the sample model SAPIBP1?Note: There are 3 correct answers to this question.
- A. Response Planning
- B. Demand Sensing
- C. Demand Driven Replenishment
- D. Inventory Optimization
- E. Sales and Operations Planning
正解:B、D、E
質問 # 42
What are some of the available ABC segmentation methods in SAP IBP?Note: There are 2 correct answers to this question.
- A. By Pareto Principle (Sorted and Calculated Values)
- B. By Pareto Principle (Sorted and Cumulated %)
- C. By Number of Items (Sorted Average)
- D. By Number of Items (Sorted Values)
正解:A、D
質問 # 43
You are working to realign the data due to a recent warehouse closure.What should you be aware of in regards to the realignment steps settings?Note: There are 2 correct answers to this question.
- A. The number of steps in the realignment run is limited to 255.
- B. A realignment step can change master data, planning objects and key figures.
- C. The name of the realignment step should be no longer than 20 characters.
- D. You must mark the realignment step as "shared" and assign the steps to users.
正解:B、D
質問 # 44
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing.Which of the following parameters can you model to plan production with extra shift(s)?
- A. Capacity expansion with additional costs
- B. Adjusted production interactive values
- C. Incremental production values
- D. Production source validity at the start of seasonal peak
正解:A
質問 # 45
A time profile is defined with these levels: day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?
- A. IF("PERIODID4" ="$$PERIODID4CU$$...)
- B. IF("PERIODID3" ="$$PERIODID3CU$$...)
- C. IF("PERIODID2" ="$$PERIODID2CU$$...)
- D. IF("PERIODID5" ="$$PERIODID5CU$$...)
正解:A
質問 # 46
Which of the following conditions are relevant for subtotals in the planning view?Note: There are 2 correct answers to this question.
- A. The total value can be added before or after the selected attribute.
- B. Only attribute-based totals can be added to the planning view.
- C. The values of the attribute-based total at the highest attribute level in the planning level can be changed.
- D. The total number of attributes that can use subtotals in the planning view can be restricted.
正解:A、D
質問 # 47
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?Note: There are 3 correct answers to this question.
- A. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
- B. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
- C. It checks whether the sourcing in the Production Source Item Master Data type exists.
- D. It checks whether the required planning level master data exists for a subset of input key figures.
- E. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.
正解:A、D、E
質問 # 48
Forecast Error CV is an input to which of the following?
- A. Forecast Error Calculation in Inventory Planning Profile Operator
- B. Multistage Inventory Optimization in Inventory Planning Profile Operator
- C. Calculate Target Inventory Components in Inventory Planning Profile Operator
- D. Time-Series-Based Supply Planning Optimizer
正解:B
質問 # 49
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check.Which settings can you change and still run a successful consistency check?Note: There are 2 correct answers to this question.
- A. Change the numbering hierarchy of the period IDs in the time profile.
- B. Add a new time profile level to the time profile.
- C. Change the past and future horizon of the levels in the time profile.
- D. Change the description of the attributes in the time profile.
正解:C、D
質問 # 50
Which sets of chart types are provided within the Analytics Advanced application?Note: There are 3 correct answers to this question.
- A. Comparison Chart Types
- B. Geographic Chart Types
- C. Trend Chart Types
- D. Seasonal Chart Types
- E. Simulation Chart Types
正解:A、C、D
質問 # 51
Why would you set up a cascading filter in the planning view?Note: There are 2 correct answers to this question.
- A. To filter data in an Application Job template
- B. To filter using attributes that have a large number of values
- C. To filter attributes based on specific values
- D. To filter attributes based on other attribute filters
正解:B、C
質問 # 52
What are the ways to achieve rolling aggregation with SAP IBP?
- A. Using a appropriate period weight factor
- B. Using a local member
- C. Using a attribute as a key figure
- D. Using a key figure calculation
正解:A
質問 # 53
You are adding a value-based filter to a planning view.Which of the following conditions apply?Note: There are 3 correct answers to this question.
- A. You can only apply one value-based filter per planning view.
- B. These filters can be used together with attribute totals in the same planning view.
- C. These filters are always applied based on the values stored in the database.
- D. You can add (or delete) planning objects to a planning view after these filters are applied.
- E. The alerts dashboard is not available if a value-based filter is set for the open planning view.
正解:A、C、E
質問 # 54
You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed?Note: There are 2 correct answers to this question.
- A. Prioritization of demand elements one by one is achieved by unconstrained heuristics.
- B. Push and Pull production models are used by the optimizer.
- C. Planning results can be generated faster by the optimizer.
- D. Finite heuristics can achieve demand prioritization and pegging.
正解:B、D
質問 # 55
For which of the following application jobs can you enter planning filters as parameters?Note: There are 2 correct answers to this question.
- A. Purge Master Data
- B. Purge Non-Conforming Data
- C. Create Time Periods for Time Profiles
- D. Purge Key Figure Data
正解:A、D
質問 # 56
What is a prerequisite for modeling outsourced manufacturers with production capacity using the Supply Optimizer?
- A. Ensure that the outsourced manufacturing locations have a separate subnetwork
- B. Model relative production costs across internal locations and outsourced manufacturing locations
- C. Model target inventory and stocks at the outsourced manufacturing location
- D. Use production lead times and offsets to manage components at the outsourced manufacturing location
正解:B
質問 # 57
You need to integrate data from SAP S/4HANA and legacy ERP to SAP IBP.What are the integration tools that you can use with such a setup for data transfer?Note: There are 2 correct answers to this question.
- A. Cloud Identity Authentication Service
- B. Cloud Integration for Data Services
- C. Smart Data Integration
- D. Real-time Integration
正解:B、C
質問 # 58
You need to make manual adjustments to your S&OP plan.Which are possible ways of making these changes?Note: There are 2 correct answers to this question.
- A. Leveraging the web-based planning capability
- B. Using Microsoft Excel planning views
- C. Leveraging the functionality of SAP Workzone
- D. Using Driver-Based planning
正解:A、B
質問 # 59
......
SAP C-IBP-2302認定試験に備えるために、SAPは、eラーニングコース、ワークショップ、認定ガイドブックなど、さまざまなトレーニングリソースを提供しています。これらのリソースは、試験のトピック、主要なコンセプト、およびベストプラクティスの概要を提供します。候補者は、包括的なトレーニング資料とライブサポートへのアクセスを提供するSAP Learning Hubも利用できます。
正真正銘のベスト試験材料はC_IBP_2302オンライン練習試験:https://www.goshiken.com/SAP/C_IBP_2302-mondaishu.html
C_IBP_2302テストエンジン練習試験:https://drive.google.com/open?id=1OZxM9Mm73CtUNS-4hD76XpZolqvCJu99