質問 # 38
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.

  • A. Maximum lot size
  • B. Minimum lot size
  • C. Aggregated constraints
  • D. Transportation lead times
  • E. Adjusted transport receipts

正解:A、D、E


質問 # 39
Which type of Master Data will be represented by the Master Data Type LOCATIONFR?

  • A. External Master Data Type
  • B. Reference Master Data Type
  • C. Compound Master Data Type
  • D. Virtual Master Data Type

正解:B


質問 # 40
How many different time levels can be selected within one planning view?

  • A. All time levels available in the time profile, restricted by global configuration parameter
  • B. All time levels available in the time profile
  • C. Only base time levels of the planning area
  • D. Only time levels from the base planning level of selected key figures

正解:B


質問 # 41
Which applications are present in the sample model SAPIBP1?Note: There are 3 correct answers to this question.

  • A. Response Planning
  • B. Demand Sensing
  • C. Demand Driven Replenishment
  • D. Inventory Optimization
  • E. Sales and Operations Planning

正解:B、D、E


質問 # 42
What are some of the available ABC segmentation methods in SAP IBP?Note: There are 2 correct answers to this question.

  • A. By Pareto Principle (Sorted and Calculated Values)
  • B. By Pareto Principle (Sorted and Cumulated %)
  • C. By Number of Items (Sorted Average)
  • D. By Number of Items (Sorted Values)

正解:A、D


質問 # 43
You are working to realign the data due to a recent warehouse closure.What should you be aware of in regards to the realignment steps settings?Note: There are 2 correct answers to this question.

  • A. The number of steps in the realignment run is limited to 255.
  • B. A realignment step can change master data, planning objects and key figures.
  • C. The name of the realignment step should be no longer than 20 characters.
  • D. You must mark the realignment step as "shared" and assign the steps to users.

正解:B、D


質問 # 44
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing.Which of the following parameters can you model to plan production with extra shift(s)?

  • A. Capacity expansion with additional costs
  • B. Adjusted production interactive values
  • C. Incremental production values
  • D. Production source validity at the start of seasonal peak

正解:A


質問 # 45
A time profile is defined with these levels: day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?

  • A. IF("PERIODID4" ="$$PERIODID4CU$$...)
  • B. IF("PERIODID3" ="$$PERIODID3CU$$...)
  • C. IF("PERIODID2" ="$$PERIODID2CU$$...)
  • D. IF("PERIODID5" ="$$PERIODID5CU$$...)

正解:A


質問 # 46
Which of the following conditions are relevant for subtotals in the planning view?Note: There are 2 correct answers to this question.

  • A. The total value can be added before or after the selected attribute.
  • B. Only attribute-based totals can be added to the planning view.
  • C. The values of the attribute-based total at the highest attribute level in the planning level can be changed.
  • D. The total number of attributes that can use subtotals in the planning view can be restricted.

正解:A、D


質問 # 47
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?Note: There are 3 correct answers to this question.

  • A. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
  • B. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
  • C. It checks whether the sourcing in the Production Source Item Master Data type exists.
  • D. It checks whether the required planning level master data exists for a subset of input key figures.
  • E. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.

正解:A、D、E


質問 # 48
Forecast Error CV is an input to which of the following?

  • A. Forecast Error Calculation in Inventory Planning Profile Operator
  • B. Multistage Inventory Optimization in Inventory Planning Profile Operator
  • C. Calculate Target Inventory Components in Inventory Planning Profile Operator
  • D. Time-Series-Based Supply Planning Optimizer

正解:B


質問 # 49
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check.Which settings can you change and still run a successful consistency check?Note: There are 2 correct answers to this question.

  • A. Change the numbering hierarchy of the period IDs in the time profile.
  • B. Add a new time profile level to the time profile.
  • C. Change the past and future horizon of the levels in the time profile.
  • D. Change the description of the attributes in the time profile.

正解:C、D


質問 # 50
Which sets of chart types are provided within the Analytics Advanced application?Note: There are 3 correct answers to this question.

  • A. Comparison Chart Types
  • B. Geographic Chart Types
  • C. Trend Chart Types
  • D. Seasonal Chart Types
  • E. Simulation Chart Types

正解:A、C、D


質問 # 51
Why would you set up a cascading filter in the planning view?Note: There are 2 correct answers to this question.

  • A. To filter data in an Application Job template
  • B. To filter using attributes that have a large number of values
  • C. To filter attributes based on specific values
  • D. To filter attributes based on other attribute filters

正解:B、C


質問 # 52
What are the ways to achieve rolling aggregation with SAP IBP?

  • A. Using a appropriate period weight factor
  • B. Using a local member
  • C. Using a attribute as a key figure
  • D. Using a key figure calculation

正解:A


質問 # 53
You are adding a value-based filter to a planning view.Which of the following conditions apply?Note: There are 3 correct answers to this question.

  • A. You can only apply one value-based filter per planning view.
  • B. These filters can be used together with attribute totals in the same planning view.
  • C. These filters are always applied based on the values stored in the database.
  • D. You can add (or delete) planning objects to a planning view after these filters are applied.
  • E. The alerts dashboard is not available if a value-based filter is set for the open planning view.

正解:A、C、E


質問 # 54
You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed?Note: There are 2 correct answers to this question.

  • A. Prioritization of demand elements one by one is achieved by unconstrained heuristics.
  • B. Push and Pull production models are used by the optimizer.
  • C. Planning results can be generated faster by the optimizer.
  • D. Finite heuristics can achieve demand prioritization and pegging.

正解:B、D


質問 # 55
For which of the following application jobs can you enter planning filters as parameters?Note: There are 2 correct answers to this question.

  • A. Purge Master Data
  • B. Purge Non-Conforming Data
  • C. Create Time Periods for Time Profiles
  • D. Purge Key Figure Data

正解:A、D


質問 # 56
What is a prerequisite for modeling outsourced manufacturers with production capacity using the Supply Optimizer?

  • A. Ensure that the outsourced manufacturing locations have a separate subnetwork
  • B. Model relative production costs across internal locations and outsourced manufacturing locations
  • C. Model target inventory and stocks at the outsourced manufacturing location
  • D. Use production lead times and offsets to manage components at the outsourced manufacturing location

正解:B


質問 # 57
You need to integrate data from SAP S/4HANA and legacy ERP to SAP IBP.What are the integration tools that you can use with such a setup for data transfer?Note: There are 2 correct answers to this question.

  • A. Cloud Identity Authentication Service
  • B. Cloud Integration for Data Services
  • C. Smart Data Integration
  • D. Real-time Integration

正解:B、C


質問 # 58
You need to make manual adjustments to your S&OP plan.Which are possible ways of making these changes?Note: There are 2 correct answers to this question.

  • A. Leveraging the web-based planning capability
  • B. Using Microsoft Excel planning views
  • C. Leveraging the functionality of SAP Workzone
  • D. Using Driver-Based planning

正解:A、B


質問 # 59
......


SAP C-IBP-2302認定試験に備えるために、SAPは、eラーニングコース、ワークショップ、認定ガイドブックなど、さまざまなトレーニングリソースを提供しています。これらのリソースは、試験のトピック、主要なコンセプト、およびベストプラクティスの概要を提供します。候補者は、包括的なトレーニング資料とライブサポートへのアクセスを提供するSAP Learning Hubも利用できます。

 

正真正銘のベスト試験材料はC_IBP_2302オンライン練習試験:https://www.goshiken.com/SAP/C_IBP_2302-mondaishu.html

C_IBP_2302テストエンジン練習試験:https://drive.google.com/open?id=1OZxM9Mm73CtUNS-4hD76XpZolqvCJu99