
完全版は2024年最新のD-VXR-DY-01試験問題集テストガイドはトレーニング専門問題
試験準備と合格するための最高なカバー率問題集を提供しています これで試験準備せよD-VXR-DY-01
質問 # 52
Which series of VxRail nodes are designed for general-purpose workloads with the smallest possible footprint in a 4-node configuration?
- A. P Series
- B. E Series
- C. G Series
- D. D Series
正解:C
質問 # 53
What action is required to enable VxRail Manager the ability to update system software and browse VxRail KB articles?
- A. Enable Secure Remote Support (SRS)
- B. Set the appliance status to 'Installed' in the Dell EMC Install database
- C. Set the Username and Password for the Support Account
- D. Configure Proxy settings
正解:C
質問 # 54
Which URL is used to enter the planning information for a new VxRail Cluster deployment?
- A. https://dl.dell.com/downloads/DL90235_Network-Validation-Tool-for-VxRail...
- B. https://www.dell.com/support/home/en-us/product-support/product/vxrail-s...
- C. https://vxrailconfiguration.dellemc.com
- D. https://etools-acg.dell.com/vxrail
正解:C
質問 # 55
Which steps need to be taken to perform a file based restore of VxRail Manager?
- A. Deploy a new VxRail Manager VM and restore the configuration from backup with the vxm_backup_restore.py script.
- B. Deploy a new VxRail Manager VM and rediscover the cluster environment executing the vxm_cluster_discovery.py script.
- C. Restore the latest cloned copy of the VxRail Manager VM from the BOSS drives on nodes 1 and 2.
- D. Restore the initial clone of the VxRail Manager VM and it will update itself to the latest status.
正解:A
質問 # 56
Which software component is an optional add-on for VxRail?
- A. VMware vSAN
- B. Dell EMC Secure Remote Support
- C. VMware vRealize Log Insight
- D. VMware vRealize Operations
正解:D
質問 # 57
What is the maximum number of nodes supported in a standard VxRail Appliance configuration?
- A. 0
- B. 1
- C. 2
- D. 3
正解:A
質問 # 58
Which proactive vSAN tests are built in vCenter?
- A. Firewall port and data utilization simulation
- B. VM creation and network performance
- C. VM creation and data utilization simulation
- D. Network performance and firewall port simulation
正解:B
質問 # 59
Beginning with VxRail version 4.7, which product license option has changed?
- A. vSphere
- B. Mware Log Insight
- C. vCenter
- D. vSAN
正解:D
質問 # 60
When preparing to generate an As-Built Configuration Report, it is determined that the VxRail Configuration JSON file was not saved from the Deployment Wizard.
What actions must be taken to retrieve the JSON file?
- A. SSH to the VxRail Manager VM with the mystic user SU to root Go to the /opt/VxRail/config directory SCP the initial-config json file to a local location
- B. Log in to vCenter with the vSphere Client with the vCenter Server Management user Go to Monitor > VxRail > Last Configuration Data Sent Use the Download option
- C. Open an FTP connection to the VxRail Manager VM with the mystic user Go to the /var/lib/vmware-marvin directory GET the config-initial json file
- D. Log in to vCenter with the vSphere Client with the vCenter Administration user Go to Configure > VxRail > System Use the Product Documentation option
正解:B
質問 # 61
An implementation engineer is attempting to add a new node to a 3 node VxRail cluster.
What is the minimum VxRail code version that no longer requires the fourth node to match the first three nodes?
- A. 4.0.302
- B. 4.5.070
- C. 4.5.150
- D. 4.0.502
正解:C
質問 # 62
What should you use to create the customer deliverable documentation of a VxRail deployment?
- A. SolVe Online
- B. As-Built Configuration Generator
- C. VxRail Manager
- D. E-Lab Advisor
正解:B
質問 # 63
A Secure Remote Services deployment on a VxRail system with external vCenter fails with Invalid target datastore specified.
What action is required to resolve this problem?
- A. Restart vCenter services and retry the deployment
- B. Manually deploy Secure Remote Services
- C. Ensure DNS is able to resolve the SRS/VE VM hostname
- D. Retry the deployment through the retry button
正解:B
質問 # 64
What is not a requirement for a VxRail External vCenter deployment?
- A. An existing datacenter name to be used for the VxRail cluster
- B. FQDN of the Embedded PSC
- C. FQDN of the vCenter Server
- D. Verification that the DNS server can resolve all VxRail ESXi hostnames
正解:B
質問 # 65
What does the VxRail NVT validate on ToR switches?
- A. VLAN and LACP configurations
- B. NTP and DNS settings
- C. VLAN and STP configurations
- D. IP address conflicts and SRS accessibility
正解:C
質問 # 66
A VxRail 7.0.100 environment is managed by the internal vCenter Server. The customer asks the implementation engineer to deploy a new VxRail cluster using the existing vCenter Server.
What should the response of the engineer?
- A. Only supported on VxRail software 4.7.xxx
- B. Not supported for internal vCenter Server
- C. Not supported on VxRail software 7.0.100
- D. Supported by neither the internal vCenter Server nor external vCenter Server
正解:C
質問 # 67
What is a difference between vSAN Data-In-Transit Encryption and vSAN Data-At-Rest-Encryption?
- A. Data-In-Transit Encryption: Addresses fear of media theft Data-At-Rest Encryption: Addresses fear of rogue administrators
- B. Data-In-Transit Encryption: Key Management Server must reside on the vSAN cluster Data-At-Rest Encryption: Key Management Server can reside on the vSAN cluster
- C. Data-In-Transit Encryption: Does not require a Key Management ServerData-At-Rest Encryption: Requires a Key Management Server
- D. Data-In-Transit Encryption: Encrypts traffic between VMs and the VxRail nodesData-At-Rest Encryption: Encrypts traffic between VxRail nodes only
正解:C
質問 # 68
What issue is one of the top reasons for failing to deploy SRS/VE in a VxRail environment?
- A. LCM errors
- B. DNS resolution failure
- C. NTP drift
- D. Excessive latency
正解:B
質問 # 69
After a successful installation, where in VxRail Manager should you collect logs?
- A. CONFIG > General > System Diagnostics > Generate New Log Bundle
- B. CONFIG > System > Log Collection > Diagnose
- C. CONFIG > System > System Diagnostics > Diagnose
- D. CONFIG > General > Log Collection > Generate New Log Bundle
正解:B
質問 # 70
The Market Place on a VxRail Manager is empty on a newly deployed system. Testing shows that the Internet is reachable through proxy in the management network.
Which action should be taken to correct this situation?
- A. Upgrade to latest version and add proxy configuration manually.
- B. VxRail Manager has no proxy support.
- C. Reset the appliance and redeploy with proxy information filled in the deployment process.
- D. Manually add the proxy information in the VxRail Manager configuration
正解:D
質問 # 71
What would be the result if no value is entered for "NTP Server(s)" in the First Run Wizard during VxRail deployment?
- A. Review and Validate screen shows a red "X"
- B. Time from the BIOS on the first ESXi host is used
- C. Time is set to UTC
- D. Validation test fails
正解:B
質問 # 72
......
検証された材料は決まってこれD-VXR-DY-01:https://www.goshiken.com/EMC/D-VXR-DY-01-mondaishu.html
合格するために必要なD-VXR-DY-01試験問題集:https://drive.google.com/open?id=1a1rS6V_HVIumQFTFbsHQLVjZicBugcva