D-VXR-DY-01試験問題集を使って一日でDell Hyperconverged Infrastructure試験合格目指す(最新の345解答) [Q170-Q194]

Share

D-VXR-DY-01試験問題集を使って一日でDell Hyperconverged Infrastructure試験合格目指す(最新の345解答)

D-VXR-DY-01試験正確な問題集、学習ノートと理論

質問 # 170
After initial installation the vSAN health check is reporting issues.
Which action needs to be taken to correct the vSAN health check error?

  • A. Reset error message to green
  • B. Update HCL database and run health check
  • C. Upgrade to the latest version of VxRail.
  • D. Upgrade to the latest driver version.

正解:D


質問 # 171
Which software is included with VxRail and provides continuous replication of virtual machines deployed on a VxRail appliance?

  • A. Dell EMC RecoverPoint for VMs
  • B. VMware vSphereData Protection
  • C. Dell EMC RecoverPoint CRR
  • D. VMware VM Snapshots

正解:A


質問 # 172
In what range does the VxRail Manager Health indicator show "yellow" for IOPS, CPU, and memory usage?

  • A. 70% - 80%
  • B. 60% - 80%
  • C. 75% - 85%
  • D. 75% - 95%

正解:C


質問 # 173
An implementation engineer is in the validation phase of a VxRail deployment with two Dell EMC ToR switches.
Which command should they run on each of the ToR switches to validate that Link Aggregation has been configured according to Dell best practices for VxRail node interfaces?

  • A. show port-channel summary
  • B. show interface
  • C. show interface status
  • D. show network-policy profile

正解:A


質問 # 174
The vSAN Health Check of a VxRail cluster is reporting errors about the stats.db object.
What could be a possible cause of this problem?

  • A. There are inaccessible/unhealthy vSAN objects
  • B. vSAN Performance Service is not enabled
  • C. vSAN Performance Service is not enabled on one of the ESX nodes
  • D. vSAN Health Service is disabled

正解:B


質問 # 175
After a successful installation, where in VxRail Manager should you collect logs?

  • A. CONFIG > System > System Diagnostics > Diagnose
  • B. CONFIG > General > System Diagnostics > Generate New Log Bundle
  • C. CONFIG > System > Log Collection > Diagnose
  • D. CONFIG > General > Log Collection > Generate New Log Bundle

正解:C


質問 # 176
A new enterprise customer will be deploying VxRail, utilizing an existing vCenter.
Which server will be used to add and validate the host and domain names?

  • A. Customer external vCenter with host file
  • B. Customer external DNS server
  • C. Internal DNS server on VxRail Manager
  • D. Internal DNS server deployed on node1

正解:B


質問 # 177
In which three VxRail Configuration Portal locations can an implementation engineer download the cluster configuration file? (Select 3)

  • A. From the My Clusters Tab in the VxRail Configuration Portal
  • B. From the Resources tab in the Edit Cluster Configuration wizard
  • C. From the customer Dell Digital Locker website
  • D. From the My Deployments tab in the VxRail Configuration Portal
  • E. From the Validate Configuration File tab when editing a cluster

正解:A、D、E


質問 # 178
An implementation engineer is expanding an existing VxRail E Series cluster with an additional node The version of the node is not at the current cluster level and is not compatible.
What action must be performed before adding the node?

  • A. Order node with correct image
  • B. Compute node expansion
  • C. RASR Factory Reset
  • D. RASR Factory Image Upgrade

正解:A


質問 # 179
A systems engineer is tasked to configure a VxRail cluster and notices that the VxRail Deployment Wizard fails to launch. The engineer discovers that the software is corrupted.
What should the engineer do to address the issue?

  • A. Return the nodes to the original build state
  • B. Verify that the JSON file is not corrupted and has all the required values
  • C. Check vCenter and troubleshoot the build failure
  • D. Use the VMware Host Client and iDRAC to access the nodes for troubleshooting

正解:A


質問 # 180
What accurately describes the positioning of a VxRail?

  • A. Can start small and grow to hundreds of nodes
  • B. Software defined solution with rack scale and integrated networking
  • C. Can start small and grow with a low entry cost
  • D. Converged architecture with enterprise grade resiliency

正解:D


質問 # 181
What is the remote management option for G Series VxRail nodes?

  • A. iLO
  • B. RMM
  • C. iDRAC
  • D. IPMI/BMC

正解:D


質問 # 182
A VxRail is being deployed with the external vCenter Server.
What is a consideration with the VxRail Management account?

  • A. Must be a local user
  • B. Cannot be a new user
  • C. Must not be part of the SSO domain
  • D. Must be assigned the VMware HCIA Management role

正解:D


質問 # 183
The VxRail Deployment Wizard is being used on a VxRail cluster with a customer-supplied VDS.
Which settings must be used to ensure successful installation?

  • A. Join an external vCenter Server
    Upload a configuration file (JSON)
  • B. Use the VxRail vCenter Server
    Use the step-by-step method
  • C. Join an external vCenter Server
    Use the step-by-step method
  • D. Use the VxRail vCenter Server
    Upload a configuration file (JSON)

正解:A


質問 # 184
Which proactive vSAN tests are built in vCenter?

  • A. VM creation and network performance
  • B. VM creation and data utilization simulation
  • C. Firewall port and data utilization simulation
  • D. Network performance and firewall port simulation

正解:A


質問 # 185
According to the VxRail PEQ Engagement Details worksheet, links to what resources should the SE send to the customer?

  • A. VxRail QuickStart Guide
    Network Validation Tool
  • B. VxRail QuickStart Guide
    VxRail Network Planning Guide
  • C. VxRail vCenter Server Planning Guide
    Network Validation Tool
  • D. VxRail vCenter Server Planning Guide
    VxRail Network Planning Guide

正解:A


質問 # 186
Which VxRail model can only be installed with static rack rails?

  • A. S Series
  • B. P Series
  • C. V Series
  • D. G Series

正解:D


質問 # 187
Match each VxRail API request with the information to be retrieved.

正解:

解説:


質問 # 188
A VxRail Stretched Cluster will be configured with four All-Flash nodes at each site based on the following requirements:
PFTT = 1
SFTT = 1
FTM = Erasure Coding
Based on the required usable capacity, what should be the planned capacity of the design?

  • A. Single Site Capacity = 150% Total Cluster Capacity = 300%
  • B. Single Site Capacity = 133% Total Cluster Capacity = 266%
  • C. Single Site Capacity = 100% Total Cluster Capacity = 200%
  • D. Single Site Capacity = 200% Total Cluster Capacity = 400%

正解:B


質問 # 189
How many nodes can be added simultaneously to an existing VxRail cluster running at code version 4.5?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

正解:A


質問 # 190
In a VxRail Stretched Cluster built from eight all-flash nodes, what should be the recommended storage policy to ensure the highest possible protection?

  • A. Raid-1(Mirroring) FTT=2
  • B. Raid-1(Mirroring) FTT=1
  • C. Raid-5/6(Erasure Coding) FTT=2
  • D. Raid-5/6(Erasure Coding) FTT=1

正解:D


質問 # 191
How must node ports on Dell EMC ToR switches be configured when the Spanning Tree Protocol is enabled in an environment?

  • A. In Port-Channel mode
  • B. As edge ports
  • C. In Forwarding status
  • D. As access ports

正解:B


質問 # 192
A newly installed VxRail system appears to have poor vSAN performance for all VMs on the cluster.
What can be used to identify the issue?

  • A. esxtop with v view
  • B. resxtop with d view
  • C. esxtop with x view
  • D. resxtop with s view

正解:D


質問 # 193
How should an administrator manually validate the DNS readiness of a customer network?

  • A. Run a traceroute to the DNS server
  • B. Ping the default gateway of the management VLAN
  • C. Run nslookup on server FQDN and IP
  • D. Generate a Network PEQ

正解:C


質問 # 194
......

D-VXR-DY-01問題集PDFで最速合格希望D-VXR-DY-01:https://www.goshiken.com/EMC/D-VXR-DY-01-mondaishu.html

100% 高得点合格保証D-VXR-DY-01無制限345解答:https://drive.google.com/open?id=1bRie_FifX6TuNRussUxI27ikirDd3zaQ