[2023年07月]更新のHPE0-S60認定実際の問題を提供します [Q41-Q60]

Share

[2023年07月]更新のHPE0-S60認定実際の問題を提供します

更新されたのはHPE0-S60問題集PDFでHPE0-S60リアル有効なブレーン問題集には82問があります!

質問 # 41
As a result of the troubleshooting process, you recommend replacing, HPE Synergy Composer modules which HPE Synergy Composer 2 Why would you recommend this change?

  • A. HPE Composer 1 cannot support remote frames, which doubles the configuration and management procedures effort
  • B. HPE Composer 1 running HPE OneView 5 2 or later can support only 12 frames within a single management nog
  • C. HPE Composer 2 can support more than the maximum 21 frames that are supported with HPE Composer 1 and HPE OneView.
  • D. HPE Composer 2 provides access to 105 interface that can be used for full management of HPE Composer 2 remotely

正解:B


質問 # 42
Your customer has an HPE Synergy platform deployed and managed using HPE OneView. The customer also has HPE Superdome Flex with RMC deployed They plan to deploy a second nPar and HPE Superdome Flex
280 They plan to manage new components using HPE OneView
What must be done to achieve this goal?

  • A. The customer must add a second Rack Management Controller for HPE Superdome Flex 280
  • B. The customer should deploy an HPE OneView appliance for HPE Superdome Flex management
  • C. The customer must use IL05 to add HPE Superdome Flex systems to HPE OneView
  • D. The customer has to add HPE Superdome Flex to the HPE OneView used to manage HPE Synergy

正解:A


質問 # 43
Your customer added a new Ethernet network in HPE Oneview mat is used to manage their HPE Synergy platform.
When the customer tries to connect one of the compute nodes to this network through the server profile, this network is not available.
What must be done to fix this issue?

  • A. To make this network available to use in the server profile, the customer must enable the Smart Link feature within network definition.
  • B. The newly created network must be added to the uplink set within the LIG, and Logical interconnect configuration must be updated from the LIG.
  • C. Check the Logical Enclosure settings and verify if the maximum number of networks allowed for this LE is reached.
  • D. Check within the server profile which server hardware is used and perform the Refresh operation on this compute node to get the latest adapter information.

正解:B


質問 # 44
An HPE Synergy customer needs to prevent a timeout and loss of communication during an external switch firmware upgrade.
Click the parameter that the customer should configure within an uplink set to meet this requirement

正解:

解説:


質問 # 45
Click the area within the iLO management interface that will allow you to access workload Advisor.

正解:

解説:


質問 # 46
Match each HPE OneView network type with its definition.

正解:

解説:


質問 # 47
Your customer is implementing an HPE Synergy solution based on three frames.
Click each of the ports that can be used to connect satellite modules.

正解:

解説:


質問 # 48
Your customer wants to add a second HPE Synergy frame to an existing logical enclosure Based on a single HPE Synergy frame. The customer wants to use a highly available master setup.
Which procedures should De performed during the expansion process? (Select two.)

  • A. Create a new logical interconnect group and enclosure group for two frames setup
  • B. Create a new logical enclosure based on both HPE Synergy frames.
  • C. Move one of the master modules to the appropriate interconnect bay in the second frame.
  • D. Modify an existing logical interconnect to include second HPE Synergy frame.
  • E. Re-parent an existing enclosure group to the new logical interconnect group.

正解:B、D


質問 # 49
Refer to the exhibit.

Which statement about this logical interconnect group is true?

  • A. The master modules are located in the interconnect bays 2 and 5
  • B. For the given downlink speed, the maximum number of frames is reached
  • C. To use interconnect bay set 3, all compute nodes must be half-height
  • D. Both master modules are located in the same HPE S ynergy frame

正解:D


質問 # 50
Which statement about manual orchestration during the firmware update is true?

  • A. It provides the ability to install an older firmware version than currently Installed In the interconnect
  • B. It is supported only for logical enclosures with at least three frames
  • C. It allows all the interconnect modules to be activated manually at the same time.
  • D. It provides an ability to select and update one side of the Interconnect topology at a time

正解:D


質問 # 51
Your customer plans to deploy HPE OneView for VMware vCenter Server together with HPE Storage Integration Pack for VMware vCenter. The customer wants to use them to manage HPE Synergy Gen10 compute modules. HPE ProLiant Gen 10 servers and an MSA array.
Which statement about compatibility of the existing environment with the planned software components is true?

  • A. HPE Storage integration Pack for VMware vCenter does not support MSA arrays
  • B. To use the required plugins HPE ProLiant Gen10 systems must be managed using HPE OneView
  • C. Both HPE Synergy Gen10 full-height compute module plugins will require a license
  • D. HPE OneView for VMware vCenter Server does not support standalone HPE ProLiant servers

正解:D


質問 # 52
Which statement about HPE OneView milestone releases is true?

  • A. A milestone release is a release with an enhanced update architecture mat is a prerequisite prior to updating to a subsequent release.
  • B. A milestone release is available for selected partners that give access to HPE OneView features which are not officially announced.
  • C. A milestone release is a release which must be installed on HPE Composer to support current version of the Service Pack for Synergy
  • D. A milestone release is a release that is published when HPE releases new hardware components to immediately support new systems

正解:C


質問 # 53
Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They also plan a vSAN deployment leveraging HPE D3940 Storage Modules and SSD drives The customer requested the following components:
- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules
- Two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
- An appropriate number of vSAN Standard licenses for each compute node
- One HPE O3940 Storage Module with 40 SSDs - All required cables and options Which statement about this request is true?

  • A. 20 SSD drives should be removed from this setup, as D3940 supports only 20 SSD or SAS drives.
  • B. One HPE Virtual Connect SE 100Gb F32 Module for Synergy should be replaced with 50GD/S ILM
  • C. vSphere Standard licenses should be replaced with Enterprise Plus licenses to enable vSAN
  • D. vSphere licenses should be added, as vSAN licenses do not replace vSphere licenses

正解:C


質問 # 54
Your customer has 6 logical enclosures spanning 18 HPE Synergy frames. The customer needs to add one more logical enclosure based on 5 HPE Synergy frames How will this change impact the customer environment?

  • A. The customer can add a new logical enclosure to the existing setup because the maximum number of logical enclosures in a single management ring is not reached.
  • B. The customer can add a new logical enclosure to an existing setup once all required licenses are added lo HPE OneView and associated with the new frames.
  • C. The customer has to expand the management ring capacity either by adding HPE Composer 2 modules or adding memory to reach 128GB per module.
  • D. The customer has to create a new management ring for new logical enclosure because the maximum number of frames m a single management ring is reached.

正解:A


質問 # 55
Your customer plans to manage HPE Primera using HPE Oneview
Which storage management tasks can be completed using HPE OneView for this environment?

  • A. Volume provisioning
  • B. CPG management
  • C. Cache management
  • D. Replication setup

正解:A


質問 # 56
Refer to the exhibit.

Which statement about this logical interconnect group is true?

  • A. An additional license is required to change the enclosure count
  • B. interconnect modules are installed in interconnect bays 1 and 4
  • C. Both modules are located in different frames for redundancy
  • D. For an uplink set, ports from different modules can be selected

正解:A


質問 # 57
Your customer used to manage their HPE 3PAR arrays using HPE OneView Now they have replaced these arrays HPE Primera.
How does managing the new arrays compare to managing their old arrays?

  • A. Management procedures and features are the same tor both types of the array
  • B. HPE OneView offers additional functionalities for HPE Primera like CPG management
  • C. HPE OneView offers limited support tor HPE Primera because of the firmware differences
  • D. To manage HPE Primera using HPE OneView. a dedicated license is required

正解:B


質問 # 58
Your customer has the following HPE Synergy setup
- 3 HPE Synergy 12000 Frames
- 4 HPE Virtual Connect SE 100 Gb F32 Modules
- 2 HPE Synergy 50 GO Interconnect Link Modules
- 36 HPE Synergy 480 Gen10 Plus compute modules
- 2 HPE Composer 2 modules
Which statement about this setup is true?

  • A. To use all compute nodes, the customer must create at least two logical enclosures
  • B. To manage all frames, the customer must buy two additional HPE Composer 2 modules
  • C. The customer must buy 36 HPE OneView Advanced licenses to manage compute modules
  • D. The customer can add one D3940 storage Module to each of the frames

正解:C


質問 # 59
You need to setup HPE Synergy frames after hardware components are discovered within HPE OneView.
Put the steps to achieve this goal into the coned order in the answer area on the right.

正解:

解説:


質問 # 60
......

あなたをお手軽にHPE0-S60試験合格させるし100%試験合格保証:https://www.goshiken.com/HP/HPE0-S60-mondaishu.html

100%無料HPE0-S60試験問題集実際問題を使おうHPE Technical問題集:https://drive.google.com/open?id=1txoQM8eyx0ixwlCMLcPVNZnNLnHbLmVa