質問 # 27
Temperatures above can damage transducers not equipped with delay line material.

  • A. manufacturer's specification
  • B. There is no limit to temperature
  • C. 280 psi
  • D. 1,000 psi

正解:A


質問 # 28
What is the working pressure of a 150 Ib. flange, SA 350 Gr.LF6 CL 1, used at 400°F?

  • A. 230 psig
  • B. 200 psig
  • C. 140 psig
  • D. 170 psig

正解:B


質問 # 29
The acronym CUI refers to.

  • A. Carpet Under Infra-structure
  • B. Corrosion Under Inside flow
  • C. Corrosion Under Insulation
  • D. Cold Under-ground In-service piping

正解:C


質問 # 30
When environmental or operating conditions produce snow and ice loads, these are considered to be.

  • A. Dead loads
  • B. environmental loads
  • C. live loads
  • D. structural loads

正解:C


質問 # 31
For a single wall material thickness, over 0.375" through 0.50", what is the hole type designation for a source side penetrameter

  • A. 0
  • B. 1
  • C. 2
  • D. 3

正解:C


質問 # 32
Rerating piping systems may be allowed only if the calculations are performed by

  • A. the piping engineer or the inspector
  • B. a third party inspection organization
  • C. the plant manager
  • D. an outside engineering firm

正解:A


質問 # 33
In a piping circuit, which of the following does not routinely have thickness measurements taken?

  • A. Straight Run Pipe
  • B. Valves
  • C. Fittings
  • D. Dead legs

正解:B


質問 # 34
An inspector is evaluating a radiograph, a light image of a "B" appears on a darker background of the radiograph, the.

  • A. radiograph should not be rejected
  • B. "B" is for identification of the weld
  • C. "B" is for identification of the welder
  • D. radiograph shall be considered unacceptable

正解:D


質問 # 35
Which of the following best describes API 574?

  • A. Recommended practice
  • B. specification
  • C. Standard
  • D. code

正解:A


質問 # 36
More than one contractor, manufacturer or installer may simultaneously qualify a welder. In such case, each participating organization shall be represented by during the test.

  • A. The welder's supervisor
  • B. A welding engineer
  • C. A responsible employee
  • D. A certified welding inspector

正解:C


質問 # 37
What is the maximum thickness measurement inspection interval for an injection point?

  • A. By Class
  • B. 10 years
  • C. 5 years
  • D. 3 years

正解:D


質問 # 38
Can the inspection interval of the system in question 24 be increased to 8 years?

  • A. If the system was insulated, the interval can be extended
  • B. Yes
  • C. Not enough information given
  • D. No

正解:B


質問 # 39
An API authorized piping inspector certificate is valid for years from its date of issuance

  • A. unlimited
  • B. 0
  • C. 1
  • D. 2

正解:C


質問 # 40
375"
0.190"
0.03 inches/year 5 Years
MAWP:

  • A. 323 psig
  • B. Metal loss exceeds the requirements for 5 year inspection interval
  • C. 674 psig
  • D. 125 psig

正解:C


質問 # 41
A piping inspector employed by the owner operator shall have

  • A. an AWS certification
  • B. an API 653 certification
  • C. an API 510 certification
  • D. not less than 10 years experience dealing with piping

正解:D


質問 # 42
can cause flame detectors used to indicate a furnace or boiler fire to give false indications on control panels.

  • A. Piping alterations in the shop
  • B. Radiographic inspection
  • C. Ultrasonic inspection
  • D. Welding or related repairs on piping

正解:B


質問 # 43
The formula t = PD/2SE computes the.

  • A. Minimum required piping thickness
  • B. maximum piping thickness
  • C. average piping thickness
  • D. minimum piping thickness

正解:A


質問 # 44
What is the inspection interval for buried piping without cathodic protection, the soil resistivity is 6,500 ohm-cm?

  • A. whenever a leak is suspected
  • B. 10 years
  • C. 15 years
  • D. 5 years

正解:B


質問 # 45
In the AWS D 5.1, what is the designation for cellulose DCEP electrode?

  • A. E 6010
  • B. E 7018
  • C. E 6011
  • D. E 7016

正解:A


質問 # 46
Excessive cyclic stresses that are well below the static yield strength of the material result in.

  • A. failure cracking
  • B. creep cracking
  • C. material failure
  • D. fatigue cracking

正解:D


質問 # 47
Welding procedures qualified by may be used, subject to the specific approval of the inspector

  • A. others
  • B. the use of API 1104 qualified procedures
  • C. the use of AWS pre qualified, D1.1 type procedures
  • D. the employer

正解:A