GoShiken HPE0-S59問題集PDFで100%合格保証付き
HPE0-S59ブレーン問題集でリアル試験最新問題2023年05月02日には60問題
HP HPE0-S59 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
| トピック 5 |
|
| トピック 6 |
|
| トピック 7 |
|
HP HPE0-S59 認定試験は、HPEコンピューティングソリューションの専門知識を証明することを望むITプロフェッショナルにとって貴重な資格です。この認定試験に合格することで、個人はキャリアアップ、収益の増加、およびこの分野でのスキルと知識に対する認識を得ることができます。
質問 # 29
An administrator tries to open iLO interlace from HPE OneView Instead of being automatically logged in a login prompt displays Where should you start the troubleshooting process?
- A. At the iLO interface to verify whether the SSO certificate is removed from an iLO.
- B. At HPE OneView Interface to verify whether the iLO processor is disabled
- C. At HPE OneView Interface to verify whether the server is In the maintenance mode
- D. At the iLO interface to verify whether the ILO Advanced license is properly applied
正解:D
質問 # 30
Your customer experienced some problems caused by outdated HPE Superdome Flex firmware. Which update method should they use to avoid these issues in the future?
- A. HPE SUM if HPE Persistent Memory firmware must be updated
- B. HPE OneView method for I/O firmware update procedure
- C. HPE OneView IT HPE Persistent Memory firmware must be updated.
- D. RMC CLI to update I/O and HPE Persistent Memory firmware
正解:D
質問 # 31
Match each HPE Synergy logical component with the definition.
正解:
解説:

質問 # 32
Your customer plans to deploy HPE Superdome Flex and configure two nPars, each based on two chassis Which components must be included in the proposal to meet the customer's needs?
- A. One base chassis and three expansion chassis with licenses
- B. Rack Management Controller for nPar management
- C. At least Tour HPE Persistent Memory DIMMs per nPar
- D. HPE Superdome Flex Grid licenses enabling connectivity between chassis
正解:A
質問 # 33
You plan to configure a Link Aggregation Group (LAG) for two connections within a server profile for a compute node running an ESXI system.
What is required from the VMware side to enable LAG?
- A. Dedicated VMKernel port
- B. Virtual Distributed Switch
- C. vSphere Standard license
- D. Load balancing cluster
正解:A
質問 # 34
Match HPE SimpliVity team with the definition.
正解:
解説:

質問 # 35
Your customer reports mat an external FC boot volume for Windows server is visible four times in the Disk Management 1 online and 3 offline.
What should you do to resolve this issue?
- A. Remove the offline disks using Windows Disk Management
- B. Install and configure MPIO on me Windows system
- C. Remove the offline disks using array management tools
- D. Disable deduplication for this volume at the array level
正解:B
質問 # 36
Your customer plans to deploy VMware ESXi 7. 0 U2, and they are looking for a hardware platform that will allow them to use up to 16 CPU sockets Which HPE compute system meets the customer requirements?
- A. HPE ProLiant DL580 Gen10
- B. HPE Synergy 480 Gen10 Plus
- C. HPE ProLiant OL380 Gen 10 Plus
- D. HPE Superdome Flex system
正解:B
質問 # 37
Your customer has 6 logical enclosures spanning 18 HPE Synergy frames. The customer needs to add one more logical enclosure based on 5 HPE Synergy frames How will this change impact the customer environment?
- A. The customer can add a new logical enclosure to an existing setup once all required licenses are added lo HPE OneView and associated with the new frames.
- B. The customer has to expand the management ring capacity either by adding HPE Composer 2 modules or adding memory to reach 128GB per module.
- C. The customer has to create a new management ring for new logical enclosure because the maximum number of frames m a single management ring is reached.
- D. The customer can add a new logical enclosure to the existing setup because the maximum number of logical enclosures in a single management ring is not reached.
正解:D
質問 # 38
Which statement about HPE Apollo 2000 Gen10 Plus platform is true?
- A. It offers servers with AMD EPYC and Intel Xeon Scalable CPUs
- B. It can support a single processor only and up to 4 per chassis
- C. It is fully managed using HPE OneView including all connections
- D. It is equipped with HPE Persistent memory by default
正解:B
質問 # 39
You modified a logical interconnect group mat is used to configure logical interconnects in five different logical enclosures. What will be the impact of that change?
- A. All physical interconnects from the affected logical interconnects must he rebooted to activate the new configuration
- B. All logical interconnects configured using this logical interconnect group will be automatically updated
- C. All logical interconnects configured using this logical Interconnect group will report inconsistency
- D. All physical interconnects from affected logical interconnects will be placed in a maintenance mode
正解:D
質問 # 40
Your customer plans to use HPE OneView for VMware vCenter Server to deploy ESXi systems. They created a server profile template that they want to use in HPE OneView.
Put the steps required to configure HPE OneView for VMware vCenter Server on the left into their correct order on the right.
正解:
解説:
質問 # 41
Match each HPE OneView network type with its definition.
正解:
解説:

質問 # 42
An HPE Synergy customer needs to prevent a timeout and loss of communication during an external switch firmware upgrade.
Click the parameter that the customer should configure within an uplink set to meet this requirement
正解:
解説:
質問 # 43
Which tool can be used to evaluate me health of an HPE Oneview appliance before proceeding with an appliance updated.
- A. HPE Composer Maintenance Console
- B. HPE OneView Firmware Compliance Report
- C. HPE OneView Update Readiness Checker
- D. HPE OneView Global Dashboard
正解:A
質問 # 44
Your customer has an HPE Synergy platform deployed and managed using HPE OneView. The customer also has HPE Superdome Flex with RMC deployed They plan to deploy a second nPar and HPE Superdome Flex
280 They plan to manage new components using HPE OneView
What must be done to achieve this goal?
- A. The customer has to add HPE Superdome Flex to the HPE OneView used to manage HPE Synergy
- B. The customer must add a second Rack Management Controller for HPE Superdome Flex 280
- C. The customer must use IL05 to add HPE Superdome Flex systems to HPE OneView
- D. The customer should deploy an HPE OneView appliance for HPE Superdome Flex management
正解:B
質問 # 45
Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They also plan a vSAN deployment leveraging HPE D3940 Storage Modules and SSD drives The customer requested the following components:
- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules
- Two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
- An appropriate number of vSAN Standard licenses for each compute node
- One HPE O3940 Storage Module with 40 SSDs - All required cables and options Which statement about this request is true?
- A. vSphere Standard licenses should be replaced with Enterprise Plus licenses to enable vSAN
- B. One HPE Virtual Connect SE 100Gb F32 Module for Synergy should be replaced with 50GD/S ILM
- C. vSphere licenses should be added, as vSAN licenses do not replace vSphere licenses
- D. 20 SSD drives should be removed from this setup, as D3940 supports only 20 SSD or SAS drives.
正解:A
質問 # 46
What is a restriction of using a RoCE network?
- A. It is by default configured as an untagged network and cannot be a part of a network set.
- B. it is not supported with HPE Virtual Connect SE 40 GD F8 Module for HPE Synergy.
- C. It does not support Private VLAN and Multicast VLAN.
- D. It does not support smart link and private network features.
正解:A
質問 # 47
Which statement about login redistribution is true?
- A. Login redistribution is available only If HPE Primera or HPE Alletra is connected directly to the HPE Synergy frame
- B. Login redistribution is used for login balancing when they are not distributed evenly over the FC links
- C. Login redistribution is supported only on the HPE Synergy Virtual Connect SE 32Gb FC Modules
- D. Login redistribution is a licensed feature and the number of licenses required depends on the number of active ports
正解:C
質問 # 48
Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They plan to use Distributed Switches and DRS cluster You are preparing a proposal with the following components:
- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules
- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
- an appropriate number of the vSphere Standard licenses for each compute node
- one HPE D3940 Storage Modules with 40 SSDs - all required cables and options Which statement about this proposal is true?
- A. 2 additional HPE Synergy 480 Gen10 Plus compute modules can be added to this setup
- B. 20 SSD drives should be removed from this setup, as D3940 supports only 20 SSD or SAS drive.
- C. One HPE Virtual Connect SE 100Gb F32 Module for Synergy should be replaced with 50GD/S ILM
- D. vSphere Standard licenses should be replaced with Enterprise Pius licenses to enable requested features
正解:D
質問 # 49
A logical interconnect group can span on multiple HPE Synergy frames for which interconnect type?
- A. Brocade 32GB Fibre Channel Switch Module for HPE Synergy
- B. HPE virtual Connect SE 32 Gb FC Module for Synergy
- C. HPE Virtual Connect SE 100 Gb F32 Module tor Synergy
- D. HPE Synergy 12 Gb SAS Connection Module
正解:C
質問 # 50
Your customer has me following HPE Synergy setup
- Three frames fully populated with HPE Synergy 480 Gen10 Plus modules and 25Gb/s downlink speed formulating a single logical enclosure
- Two HPE Virtual Connect SE 100Gb F32 Module for Synergy
- Four HPE Synergy 50Gb interconnect Link Module
- Six HPE Synergy Virtual Connect SE 32Gb FC Modules
The customer needs to add a frame.
Which statement about the expansion of this setup is true?
- A. The additional frame must have HPE Virtual Connect FC modules installed
- B. The additional frame cannot have 12Gb SAS connection modules installed
- C. The customer has to create a new logical enclosure for the additional frame
- D. The customer can grow the existing logical enclosure up to 5 frames
正解:C
質問 # 51
Click the area within the iLO management interface that will allow you to access workload Advisor.
正解:
解説:
質問 # 52
Refer to the exhibit.
Which statement about this logical interconnect group is true?
- A. For an uplink set, ports from different modules can be selected
- B. Both modules are located in different frames for redundancy
- C. An additional license is required to change the enclosure count
- D. interconnect modules are installed in interconnect bays 1 and 4
正解:C
質問 # 53
......
HP HPE0-S59(HPE Compute Solutions)試験は、ITプロフェッショナルがHPEコンピューティングソリューションを設計、実装、管理するスキルと知識を検証するための認定試験です。この試験は、HPEコンピューティングソリューションアーキテクトまたはエンジニアとしてキャリアを追求したい個人に最適です。HPE0-S59試験では、サーバーアーキテクチャとテクノロジー、ストレージソリューション、ネットワーキング、仮想化、クラウドコンピューティングなど、さまざまなトピックがカバーされています。
HPE0-S59問題集には100%厳密検証された問題と解答で合格保証付きもしくは全額返金:https://www.goshiken.com/HP/HPE0-S59-mondaishu.html
最新HPE0-S59PDF問題集リアル無料テスト本日更新です:https://drive.google.com/open?id=1XZIS23IdCeH0CTVHHNSCLZ7R4G2HQ-pu